-
Reconnaissance Survey Seymour Lake Data Cards
These data cards describe the quality of Seymour lake, including the species and vegetation present and the current and potential recreational use. A chemical analysis for... -
Seymour Lake Stocking and Planting Notes 1958
This resource includes hand written and typed reports regarding Seymour Lake stocking and planting in 1958. -
Toboggan Creek Fan Sensitive Area Management Plan
This document outlines the reasoning behind designating a portion of the Glacier Gulch/Toboggan Creek fan a sensitive area. The objectives of the sensitive area are statements... -
An Investigation of the Condition of Kathlyn Lake, with Suggestions for Rehabilitation
As early as 1970, and continuing into the year 1973, concerned citizens of the Smithers area brought to the attention of the Water Resources Services the fact that nuisance weed... -
Fisheries Assessment of Proposed Rip Rap Sites from Km17 to Km25 Morice River 1998
Slope failures along this section have led to a number of proposed remedial works, including rip rap placement at sites identified by the Ministry of Environment, Lands and... -
Trout Creek/Moricetown Watershed Assessment Project
This document contains information on the Level I Sediment Source Assessment. The Consolidated Access Management Plan (AMP) and the Interior Watershed Assessment Program (IWAP)... -
Pacific North Coast Integrated Management Area Plan
The Pacific North Coast Integrated Management Area ( PNCIMA ) is one of five national Large Ocean Management Areas identified in Canada’s 2005 Oceans Action Plan. The plan... -
Bulkley Higher Level Plan GIS Data Cut to Babine Watershed
GIS Shape files from the Bulkley Higher Level Plan Orders as they relate to the Lower Babine Watershed (Babine River). -
Pacific Trail Pipelines Project: Volume 1 Report - Application for Environmental Assessment Certificate
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information... -
Pacific Trail Pipelines Project: Application No.4 to Amend Environmental Assessment Certificate No.E08-01
This environmental effects assessment, like the effects assessment provided in the 2007 EAC Application, is a sustainability-based environmental assessment that considers five... -
Kitimat to Summit Lake Natural Gas Pipeline Looping Project: Conceptual Compensation Plan for Fish Habitat
Construction of the Kitimat to Summit Lake Natural Gas Pipeline Looping Project (the KSL Project) will enable delivery of natural gas from the Kitimat Liquefied Natural Gas... -
Kitimat - Summit Lake Pipeline Looping Project: Assessment Report
The purpose of this Assessment Report is to: describe the Project; summarize the process for the review of the Application; report on the adequacy of the Proponent’s... -
Pacific Trail Pipelines Project: Application to Amend Environmental Assessment Certificate No. E08-01 - Final Report
This environmental assessment, like the effects assessment contained in the original 2007 EAC Application, is a sustainability-based environmental assessment that considers the... -
Telkwa Coal Project Appendix 8: Geotechnical and Hydrogeological Investigations Tailings Pond Area 1996
Piteau Engineering Ltd. (PEL) was retained by Manalta Coal Ltd. (Manalta) to conduct a series of geotechnical and hydrogeological investigations in support of the proposed... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed... -
Vopak Pacific Canada Project Description
The purpose of the Project is to provide berthing and loading facilities for bulk liquid cargo that will be received via the existing rail loop on Ridley Island. Due to the... -
Pacific Future Energy Refinery: Project Description
This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will... -
Northwest Transmission Line Project: Assessment Report
This Assessment Report considers the proposed project's potential to cause significant adverse environmental, social, economic, heritage, and health effects. It identifies...