Water Quality Effectiveness Evaluations and Fish Passage Culvert Inspection
Water Quality Effectiveness Evaluations arose out of the Forest and Range Practices Act as a way of measuring the effectiveness of the Act in accomplishing its forest... -
Bioassessment of Streams in North-Central British Columbia Using the Reference Condition Approach: Final Report v.2a
This report outlines results from three years of RCA model development for the Skeena Region. It includes the development of standard methods for collecting and analyzing data... -
Annual Compendium of Aquatic Rehabilitation Projects for the Watershed Restoration Program 1998-1999
B.C.'s Watershed Restoration Program (WRP) was implemented under the Province's Forest Renewal Plan in mid-1994 in response to a historical lack of mechanisms for ensuring... -
Trout Creek/Kitseguecla Landscape Unit Plan
The Trout Creek Landscape Unit Plan (LUP) outlines the objectives and the strategies for the resource management of the Trout Creek and Toboggan watershed within the Bulkley... -
Lakelse 2060: A 50 Year Vision for the Lakelse Watershed
The projects in this report are planning exercises based upon the simple thesis, “If you want this specific value in 50 years (be it swimming or water quality or grizzly bears),... -
Sustaining Lakelse Lake
A brief summary and visual results to natural resources and perks in Lakelse Lake. -
Killutsal Creek Rearing Pond Enhancement
The Lakelse is a prized recreational area both locally and regionally. Many small and large creeks enter the river along its 14-km length and fish values in these creeks are... -
Environmental and Socio-Economic Effects Report
This report is part of BC Hydro's transmission line from Terrace to Kitimat planning process to identify potential Project effects and proposed mitigation for biophysical or... -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan Enbridge Northern Gateway Project - Version 2.0
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the... -
Reconnaissance Geochemical Soil Survey and Reconnaissance Geological Survey Report on the Spring Group
The purpose of the reconnaissance geological survey was to determine whether the board band of favourable volcanic host rocks seen on the northwest section of the Topley... -
Fisheries Assessment of Proposed Rip Rap Sites from Km17 to Km25 Morice River 1998
Slope failures along this section have led to a number of proposed remedial works, including rip rap placement at sites identified by the Ministry of Environment, Lands and... -
Pacific North Coast Integrated Management Area Plan
The Pacific North Coast Integrated Management Area ( PNCIMA ) is one of five national Large Ocean Management Areas identified in Canada’s 2005 Oceans Action Plan. The plan... -
Bulkley Higher Level Plan GIS Data Cut to Babine Watershed
GIS Shape files from the Bulkley Higher Level Plan Orders as they relate to the Lower Babine Watershed (Babine River). -
Pacific Trail Pipelines Project: Volume 1 Report - Application for Environmental Assessment Certificate
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information... -
Pacific Trail Pipelines Project: Application No.4 to Amend Environmental Assessment Certificate No.E08-01
This environmental effects assessment, like the effects assessment provided in the 2007 EAC Application, is a sustainability-based environmental assessment that considers five... -
Kitimat to Summit Lake Natural Gas Pipeline Looping Project: Conceptual Compensation Plan for Fish Habitat
Construction of the Kitimat to Summit Lake Natural Gas Pipeline Looping Project (the KSL Project) will enable delivery of natural gas from the Kitimat Liquefied Natural Gas... -
Kitimat - Summit Lake Pipeline Looping Project: Assessment Report
The purpose of this Assessment Report is to: describe the Project; summarize the process for the review of the Application; report on the adequacy of the Proponent’s... -
Pacific Trail Pipelines Project: Application to Amend Environmental Assessment Certificate No. E08-01 - Final Report
This environmental assessment, like the effects assessment contained in the original 2007 EAC Application, is a sustainability-based environmental assessment that considers the... -
Telkwa Coal Project Appendix 8: Geotechnical and Hydrogeological Investigations Tailings Pond Area 1996
Piteau Engineering Ltd. (PEL) was retained by Manalta Coal Ltd. (Manalta) to conduct a series of geotechnical and hydrogeological investigations in support of the proposed...