-
Water Quality Effectiveness Evaluations and Fish Passage Culvert Inspection
Water Quality Effectiveness Evaluations arose out of the Forest and Range Practices Act as a way of measuring the effectiveness of the Act in accomplishing its forest... -
Lakelse 2060: A 50 Year Vision for the Lakelse Watershed
The projects in this report are planning exercises based upon the simple thesis, “If you want this specific value in 50 years (be it swimming or water quality or grizzly bears),... -
Environmental and Socio-Economic Effects Report
This report is part of BC Hydro's transmission line from Terrace to Kitimat planning process to identify potential Project effects and proposed mitigation for biophysical or... -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan Enbridge Northern Gateway Project - Version 2.0
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the... -
Pacific North Coast Integrated Management Area Plan
The Pacific North Coast Integrated Management Area ( PNCIMA ) is one of five national Large Ocean Management Areas identified in Canada’s 2005 Oceans Action Plan. The plan... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information... -
Pacific Trail Pipelines Project: Application No.4 to Amend Environmental Assessment Certificate No.E08-01
This environmental effects assessment, like the effects assessment provided in the 2007 EAC Application, is a sustainability-based environmental assessment that considers five... -
Pacific Trail Pipelines Project: Application to Amend Environmental Assessment Certificate No. E08-01 - Final Report
This environmental assessment, like the effects assessment contained in the original 2007 EAC Application, is a sustainability-based environmental assessment that considers the... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed... -
Vopak Pacific Canada Project Description
The purpose of the Project is to provide berthing and loading facilities for bulk liquid cargo that will be received via the existing rail loop on Ridley Island. Due to the... -
Pacific Future Energy Refinery: Project Description
This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will... -
Northwest Transmission Line Project: Assessment Report
This Assessment Report considers the proposed project's potential to cause significant adverse environmental, social, economic, heritage, and health effects. It identifies... -
Gitanyow Huwilp Recognition and Reconciliation Agreement Part 2: Gitanyow Lax'yip Land Use Plan
Part 2: Gitanyow Lax'yip land use plan contains: Schedule A Gitanyow Wilp Territory maps showing land use zones and management areas; and Schedule B management objectives for... -
Development of a Climate Change Index of Stress Using Future Projected BEC: Proof of Concept for the Nadina TSA
Immigration of climatically-suited species could lead to recovery, but is not expected to keep pace with climate change (Aitken et al. 2008, McLachlan et al. 2005), thus future... -
Interim Assessment Protocol for Aquatic Ecosystems in British Columbia: Standards for British Columbia’s Cumulative Effects Framework Values Foundation
The Aquatic Ecosystems assessment protocol currently describes the derivation of a core set of watershed indicators that can be calculated consistently across the province using... -
Nadina Mountain Park Management Plan
The Nadina Mountain Park management plan establishes long-term strategic direction for Nadina Mountain Park. It sets out a vision for the future state of the park; addresses... -
Skeena Cumulative Effects Assessment
This Skeena Cumulative Effects Assessment (SCEA) documents the analysis of the cumulative effects of individual and multiple physical, biological and chemical stressors... -
Morice Lake Park Management Plan
The Morice Lake Management Plan establishes long-term strategic direction for Morice Lake Park. It sets out a vision for the future state of the park; addresses current issues... -
Climate Change Adaptation Planning for Northwest Skeena Communities: Summary Report for the Future Forest Ecosystem Scientific Council
The following summary first describes the general research process for the overall project, notes deviations from the project plan, and then summarizes key findings and outcomes... -
Rare Ecosystems of the Babine River Watershed
Our objective was to identify rare ecosystems in the watershed using existing data such as field reports, terrestrial ecosystem mapping projects, and predictive ecosystem...