Maxan Watershed Stream Habitat Restoration and Enhancement Level 2 Design...
AGRA Earth & Environmental Limited (AEE) was retained by Dz'ilh K'Az Kwa Development Corporation (DKK) to design stream habitat restoration and enhancement measures in the... -
Analysis and Priority Identification of Existing Fish Passage Data: Bulkley...
For this project, existing fish passage information in the Bulkley River watershed located near Smithers, British Columbia, was reviewed in order to prioritize and rank culverts... -
Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field... -
Upper Zymoetz (Copper River) WRP Overview Fish and Riparian Assessment
This report summarizes fish and fish habitat values within the Copper River watershed and describes impacts to both the fisheries resource and riparian habitats regulating from... -
Tenas Project 2017-2018 Baseline Report Final
This consolidated baseline report aims to provide information on field programs and their respective field summaries for the the 2017 to spring 2018 programs of the Tenas Project. -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the... -
Skeena Fish Passage Culvert Inspection (FPCI) Surveys
In 2005, the Skeena Fisheries Commission was retained by the Pacific Salmon Commission to conduct a Fish Passage and Culvert Inspection (FPCI) on all non-bridged stream... -
Review and Assessment of Water Quality in the Skeena River Watershed,...
Historical water quality data presented for the Skeena River watershed are divided into nine subsequent sections, corresponding to the nine major watershed reaches. Each section... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The... -
Pacific Trail Pipelines Project: Application to Amend Environmental...
This environmental assessment, like the effects assessment contained in the original 2007 EAC Application, is a sustainability-based environmental assessment that considers the... -
Pacific Trail Pipelines Application Volume II: Baseline Studies
These baseline studies cover the following topics with regards to the impacts of the Pacific Trail Pipeline: acid rock drainage and metal leaching, acoustic environment, air... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information... -
Natural Resource Stewardship Monitoring and Assessment Report for the...
Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data... -
Morrison Copper/Gold Application and Supporting Studies
This dataset contains elements of the Morrison Copper/Gold mine application which are relevant to salmon in the Skeena watershed. The document itself and its appendices... -
Morice Fish and Aquatic Habitat Review 2013
The purpose of this project is to document alterations and impacts to Wet’suwet’en land and resources, particularly in regard to anadromous and freshwater resident fish and... -
Kitimat - Summit Lake Pipeline Looping Project: Assessment Report
The purpose of this Assessment Report is to: describe the Project; summarize the process for the review of the Application; report on the adequacy of the Proponent’s... -
Kitimat - Summit Lake (KSL) Pipeline Looping Project: Project Description
This project description has been prepared for submission to the B.C. Environmental Assessment Office (EAO) in accordance with the requirements of the B.C. Environmental... -
Fish and Fish Habitat Inventory for Forest Licences A-16823 and A-16825 Endako Area
Nine sub-drainages were surveyed within the area covered by this report. The predominant objectives of this project were to provide reach-specific information on fish... -
Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed
This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose... -
Davidson Project: Application for Environmental Assessment Certificate
This underground mining project will be located in the Bulkley-Nechako Regional District and in the traditional territory of the Wet'suwet'en people. Included in this dataset...