-
Culvert Outlet Stream Restoration 34km Suskwa FSR
In 1996 and 1997 a culvert on an unnamed tributary at 34km Suskwa FSR was identified as a barrier to fish migration in assessments. The project focused on providing fish passage... -
ROUTINE EFFECTIVENESS EVALUATIONS IN SELECTED SITES IN THE BULKLEY TSA
Silvicon Services Inc. was retained in 2006 by Pacific Inland Resources (a Division of West Fraser Mills Ltd.) to conduct Routine Effectiveness Evaluations on eleven sites... -
Km. 39.2 Morice River FSR Fish Passage Project
The Morice River FSR is a typical double lane forest resource access road constructed during the 1950s. The crossing at 39.2 km consisted of a single closed bottom 1800mm wooden... -
Richfield Creek Riparian Exclusion Fencing and Restoration
Richfield Creek was included in a larger riparian restoration initiative in 2021 through the Morice Water Monitoring Trust (see dataset: Upper Bulkley Riparian Restoration). The... -
Reconnaissance Level Fish and Fish Habitat Inventories in the Bulkley T.S.A.
These reports summarize the reconnaissance level fish and fish habitat inventories for various locations along the Bulkley River. Sensitive habitats and barriers are discussed,... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory in the Harold...
Triton Environmental Consultants Ltd. (Triton, Terrace) was retained by Pacific Inland Resources Ltd. (PIR) to conduct a Reconnaissance (1:20,000 scale) Fish and Fish Habitat... -
Reconnaissance 1:20,000 Fish and Fish Habitat Inventory of the Telkwa River Watershed
Triton Environmental Consultants Ltd. (Triton, Terrace) was retained by Pacific Inland Resources Ltd. (PIR) to conduct a Reconnaissance (1:20,000 scale) Fish and Fish Habitat... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory of the Lower Buck...
The lower portion of Buck Creek watershed, downstream of Klo Creek, were inventoried in August and September 2001 to assess fish habitat characteristics and to investigate the... -
1:5,000 Fish and Fish Habitat Inventory of Unnamed Tributaries to the Babine River
Triton Environmental Consultants Ltd. (Terrace branch) was retained by Pacific Inland Resources (PIR) to conduct 1:5,000 level fish and fish habitat inventory in sub-basins of 8... -
2022 Fish Habitat Assessment in the BCTS Babine Business Area (Smithers Field Unit)
In April 2022, FINS Consulting Ltd. (FINS) was retained by Silvicon Services Inc. (Silvicon) to confirm stream classification of the selected streams in proposed blocks located... -
Fish and Fish Habitat Inventory for Operational Areas Fulton River Watershed...
The study area is located in Fulton River watershed of the Babine drainage in north-central British Columbia (Figure 1). Selected streams in the area were inventoried for Forest... -
Reconnaissance Level Fish and Fish Habitat Inventory in the Bulkley T.S.A. -...
Triton Environmental Consultants Ltd. was retained by Pacific Inland Resources Ltd. (PIR) in partnership with the Ministry of Environment, Lands and Parks (MELP) in Smithers to... -
Fish Passage Restoration Projects - Telkwa River Watershed
The objective of this project was to assess fish passage at selected culvert bearing road crossings within the Telkwa River watershed. The assessments were carried out at... -
Suskwa Watershed Restoration Program
A list of priorities for restoration sites in the Suskwa Watershed was developed from the Suskwa 1996/97 Fiscal Report. These priorities, prescriptions, and works are... -
Bulkley/Kispiox River Agricultural Stream Restoration Assessment
Funding application containing information on two planned restoration project in the bulkley & kispiox watersheds; one on Toboggan creek and one on Maxan Creek. Assessment... -
2015 Inventory of High Priority Culverted Fish Passage Barriers
There is no description for this dataset
-
Bulkley River Watershed Connectivity Remediation Plan: 2021-2031
This plan represents the culmination of a collaborative planning process undertaken in the Bulkley River watershed over many months of work with a multi-partner planning team of... -
Waterfall Creek Restoration Project 2001
The restoration/rehabilitation works funded through Forest Renewal BC were carried out on Waterfall Creek in late fall of 2001 and consisted of the removal and replacement of... -
Waterfall Creek Enhancement Project 2000
A restoration/rehabilitation plan was developed that recommended and initiated measures to address community concerns by supplying survey and design for rehabilitation work,... -
Bulkley River and Morice River Watershed Groups Fish Passage Restoration Planning
In April of 2020, the Society for Ecosystem Restoration Northern British Columbia (SERNbc) undertook an initiative to plan and conduct fish passage restoration planning...
