Review of Cattle-Community Watershed Conflicts in the Skeena Region
This report provides the B.C. Ministry of Environment, Lands & Parks (BCE) with a review of cattle farming in the Skeena Region, and a recommendation for monitoring the... -
Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field... -
Vopak Pacific Canada Project Description
The purpose of the Project is to provide berthing and loading facilities for bulk liquid cargo that will be received via the existing rail loop on Ridley Island. Due to the... -
Upper Skeena and Kispiox River Juvenile Steelhead Surveys 1999
In 1999, the Ministry of Environment, Lands, and Parks surveyed portions of the Upper Skeena River and Kispiox Rivers during September 1999 for juvenile steelhead and fry and... -
Upper Bulkley River and Toboggan Creek Overwintering Studies
An overwintering study was conducted over three winters (November 1998 to March 2001) in the Upper Bulkley and Toboggan Creek watersheds in north-central British Columbia. The... -
Upper Bulkley River Steelhead Population Monitoring
The upper Bulkley River system, near Houston, was first assessed by the Fish Habitat Improvement Section in 1981. The initial assessment identified probably areas of importance... -
The Maxan Lake Multi-Land Use Study: A Summary Review
The objective of the Maxan Lake multi-land use study was to examine the interaction between various forms of land use on an area having multi-use capacity. To this end, various... -
The Flooded Tailings Impoundment at the Equity Silver Mine
The Equity Silver Mine operated between 1980 and 1994, producing silver, gold, and copper from three open pits and a small underground operation. Mine components include a... -
Telkwa Coal Project Appendix 6: Baseline Data, Surface Water, and Groundwater 1994
Samples were collected for the first time from a watercourse on the proposed project site on the north side of the Telkwa, and from sites on the Telkwa River and Goathorn Creek... -
Skeena Environmental Effects Monitoring (EEM) Pre-Design Reference Document
This document provides a basis for the design phase of an environmental effects monitoring program (EEM) for Repap's pulp and paper mill, Skeena Cellulose Inc., located near... -
Site-Specific Water Quality Guidelines for Skeena River at Usk for the...
Site-specific water quality guidelines for the Skeena River at Usk for the purpose of national reporting (May 2005). This document is one in a series that presents ambient site-... -
Sampling of Metals and Aquatic Life in the Bulkley River Adjacent to the...
This study was carried out to monitor the effects, if any, of the former Topley Concentrate Shed Site ("Topley Site") on concentrations of dissolved and total metals and other... -
Reconnaissance Level Fish and Fish Habitat Inventory for the Kispiox Forest District
Forest Renewal BC is implementing fish and fish habitat inventories to provide information required for resource planning. Triton's goals were to describe fish distributions and... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The... -
Pacific Northwest LNG: Project Description
Pacific NorthWest LNG Limited Partnership (PNW LNG) is proposing to construct and operate a liquefied natural gas (LNG) export facility within the District of Port Edward,... -
Nutrients and Algae in the Upper Bulkley River watershed 1997-2000
This study focused on the diffuse sources of nutrients and the trophic status of the Upper Bulkley River. Monthly water chemistry monitoring of the Upper Bulkley and tributaries... -
Morrison Copper/Gold Project 3rd Party Review Response Report
This report presents the response to the 3rd Party Review of the Environmental Assessment for the Morrison Copper/Gold Project. The 3rd Party Review was requested by the...