The Flooded Tailings Impoundment at the Equity Silver Mine

The Equity Silver Mine operated between 1980 and 1994, producing silver, gold, and copper from three open pits and a small underground operation. Mine components include a flooded tailings impoundment constructed from till and waste and quarried rock. This paper describes the initial design and subsequent performance of the flooded tailings impoundment. Materials disposed in the tailings impoundment include tailings, lime treatment sludge, cyanide and acidic drainage.

Data and Resources

Contributing Organization

Newmont Canada Equity Silver Mine

Datasets pertaining to the Equity Silver mine. The Equity Silver mine is a former open pit and underground mine located 35 southeast of Houston BC. The mine produced gold, silver, and copper mine ore during its operation from 1980-1996, and is...

Additional Info

Field Value
Author Price, W.A. and M. Aziz
Maintainer Newmont Canada Equity Silver Mine
Last Updated July 25, 2022, 20:21 (UTC)
Created February 22, 2019, 17:22 (UTC)
publication_yr 2013