The Flooded Tailings Impoundment at the Equity Silver Mine

The Equity Silver Mine operated between 1980 and 1994, producing silver, gold, and copper from three open pits and a small underground operation. Mine components include a flooded tailings impoundment constructed from till and waste and quarried rock. This paper describes the initial design and subsequent performance of the flooded tailings impoundment. Materials disposed in the tailings impoundment include tailings, lime treatment sludge, cyanide and acidic drainage.

Data and Resources

Additional Info

Field Value
Source URL
Version
Author Price, W.A. and M. Aziz
Data Steward Newmont Canada Equity Silver Mine
Publication Year 2013