Morice Watershed Restoration Project
This datasets contains information and reports connected to the Morice Watershed restoration project, funded through Forest Renewal BC (FRBC). -
Juvenile Coho Studies at the Telkwa River Ponds
The purpose of these studies is to undertake coho smolt enumeration at Km 1010 and 1011 in the Bulkley River, to compare mark-and-recapture population estimates, and to measure... -
Maxan Watershed Stream Habitat Restoration Works 1998/99
This report included Habitat Restoration Prescriptions for 12 sites on the Bulkley River, 2 sites on Foxy Creek, and 1 site on lower Maxan Creek. -
Kispiox Watershed Restoration Project
This dataset contains information regarding the Kispiox Watershed Restoration Project, funded through Forest Renewal BC (FRBC). -
Toboggan Creek Stream Rehabilitation and Silvern Lakes Road Deactivation
The objectives of this project are to re-establish and maintain the original stream channel, protect fish habitat, maintain fish passage and maintain 4wheel drive recreational... -
Bushman Creek In-stream Maintenance Works
This document provides insight on the Bushman Creek In-Stream Maintenance Works, targeting the maintenance and repair of approximately 350m of channel extending upstream from... -
Hatchery Creek Spawning Habitat Improvement Project
This report summarizes a habitat improvement project which was funded by the Pacific Salmon Commission and is intended to be a record of the project to provide a better... -
Zymoetz (Copper) River Watershed Restoration Program: 16-Km Side Channel (Site 54B)
This dataset focuses on the restoration works conducted at Site 54B, one of the many restoration works conducted along the the Zymoetz (Copper) Rivers in the late 1990s/early... -
Unnamed Kispiox Lake (Bartok Lake) Outlet Spawning Gravel Placement
In 1991, technicians with the Recreational Fisheries Branch undertook a restoration project at an unnamed lake, dubbed Bartok lake, approximately 80 km north of Hazelton. This... -
Beaver Dam Mitigation and Nuisance Beaver Control
In 2023, the Gitanyow Fisheries Authority (GFA) was contracted by the BC Ministry of Forests to manage beaver dam mitigation and control in the Kitwanga and Nass watersheds. The... -
Upper Williams Creek Spawning Channel
This dataset contains reports related to the channel excavation of the Upper Williams Spawning Channel project. The project is part of a series of initiatives within the Lakelse... -
1st Avenue Culvert Replacements Lakelse Lake
The project focused on the replacement of eleven culverts along 1st Avenue at Lakelse Lake to improve fish passage. -
Bulkley River Bank Stabilization and Riparian Rehabilitation - Telkwa
The project was conducted on a privately owned site (Wittwer Ranch) around 4km upstream from Telkwa, northern BC. The goal of the Bulkley River Bank Stabilization and Riparian... -
Spring Creek Habitat Restoration Project
The Spring Creek Habitat Restoration Project was initiated under the Habitat Restoration Salmonid Enhancement Program to develop or improve coho salmon habitat in the Spring... -
Kitwanga River Side Channel Habitat Improvement Project
The Kitwanga River drainage is a tributary to the Skeena River located 90 kilometres northwest of Terrace, B.C. The Kitwanga River side channel habitat improvement project... -
Kitwanga River Coho Habitat Enhancement 2005
The Kitwanga River drainage is a tributary of the Skeena River and is located approximately 90 kilometres northwest of Terrace, B.C. The Upper Kitwanga River has excellent... -
Waterfall Creek Enhancement Project 2000
A restoration/rehabilitation plan was developed that recommended and initiated measures to address community concerns by supplying survey and design for rehabilitation work,... -
Cranberry and Kitwanga Rivers Fish Passage Inspection and Restoration projects
A series of 5 studies on the Kitwanga & Cranberry rivers pertaining to fish passage crossings and water quality evaluations. The first four studies were focused on... -
Killutsal Creek Rearing Pond Enhancement
Lakelse lake is a prized recreational area both locally and regionally. Many small and large creeks enter the river along its 14-km length and fish values in these creeks are... -
Copper River Watershed Restoration Program: Copper River 3Km Off-channel Site
One project aim was the improvement of fish habitat. The site is located adjacent to the Copper River forest services road, between km 2 and 3, approximately 10 km east of...