Exchamsiks Fish Ladder Replacement
The construction of Highway 16 and the Canadian National Railway (CN Rail) cut off two relatively large channels (known as the Exchamsiks Backchannel area) from the Skeena River... -
Stream Crossing Replacements in the Babine Lake Watershed of the Sutherland...
This datasets contains information about the Stream Crossing Replacements in the Babine Lake Watershed of the Sutherland Operating Area, Vanderhoof Forest District, Northern... -
Suskwa Watershed Restoration Program
A list of priorities for restoration sites in the Suskwa Watershed was developed from the Suskwa 1996/97 Fiscal Report. These priorities, prescriptions, and works are... -
West Babine Fish Passage Restoration Project
The project was conducted to improve fish passage at multiple sites in the West Babine watershed. Fish passage was interrupted due to unpassable culverts. The Torkelson... -
Waterfall Creek Restoration Project 2001
The restoration/rehabilitation works funded through Forest Renewal BC were carried out on Waterfall Creek in late fall of 2001 and consisted of the removal and replacement of... -
Kitwanga Sockeye Salmon Spawning Habitat Improvement Initiative
Since 1999, the Gitanyow Fisheries Authority has been intensively studying the Kitwanga Watershed in an effort to understand the decline of the Kitwanga sockeye stock.... -
Kispiox Watershed Restoration Project
This dataset contains information regarding the Kispiox Watershed Restoration Project, funded through Forest Renewal BC (FRBC). -
Waterfall Creek Enhancement Project 2000
A restoration/rehabilitation plan was developed that recommended and initiated measures to address community concerns by supplying survey and design for rehabilitation work,... -
Kitwanga River Coho Habitat Enhancement 2005
The Kitwanga River drainage is a tributary of the Skeena River and is located approximately 90 kilometres northwest of Terrace, B.C. The Upper Kitwanga River has excellent... -
Kitseguecla River South Sub-Basin - Monitoring, Assessment, Restoration, Evaluation
This dataset focuses on stream restoration efforts and related activities conducted in the area of the Kitseguekla/Kitseguecla River South Sub-Basin. -
Juvenile Coho Studies at the Telkwa River Ponds - Telkwa Rearing Ponds
The purpose of these studies is to undertake coho smolt enumeration at Km 1010 and 1011 in the Bulkley River, to compare mark-and-recapture population estimates, and to measure... -
Kitwanga River South Sub-Basin - Monitoring, Assessment, Restoration
This dataset focuses on stream restoration efforts and related activities conducted in the area of the Kitwanga River South Sub-Basin. -
Morice Watershed Restoration Project
This datasets contains information and reports connected to the Morice Watershed restoration project, funded through Forest Renewal BC (FRBC). -
Maxan Watershed Stream Habitat Restoration Works 1998/99
This report included Habitat Restoration Prescriptions for 12 sites on the Bulkley River, 2 sites on Foxy Creek, and 1 site on lower Maxan Creek. -
Toboggan Creek Stream Rehabilitation and Silvern Lakes Road Deactivation
The objectives of this project are to re-establish and maintain the original stream channel, protect fish habitat, maintain fish passage and maintain 4wheel drive recreational... -
Bushman Creek In-stream Maintenance Works
This document provides insight on the Bushman Creek In-Stream Maintenance Works, targeting the maintenance and repair of approximately 350m of channel extending upstream from... -
Hatchery Creek Spawning Habitat Improvement Project
This report summarizes a habitat improvement project which was funded by the Pacific Salmon Commission and is intended to be a record of the project to provide a better... -
Zymoetz (Copper) River Watershed Restoration Program: 16-Km Side Channel (Site 54B)
This dataset focuses on the restoration works conducted at Site 54B, one of the many restoration works conducted along the the Zymoetz (Copper) Rivers in the late 1990s/early... -
Unnamed Kispiox Lake (Bartok Lake) Outlet Spawning Gravel Placement
In 1991, technicians with the Recreational Fisheries Branch undertook a restoration project at an unnamed lake, dubbed Bartok lake, approximately 80 km north of Hazelton. This... -
Beaver Dam Mitigation and Nuisance Beaver Control
In 2023, the Gitanyow Fisheries Authority (GFA) was contracted by the BC Ministry of Forests to manage beaver dam mitigation and control in the Kitwanga and Nass watersheds. The...