Copper River Watershed Restoration Program: Copper River 3Km Off-channel Site

One project aim was the improvement of fish habitat. The site is located adjacent to the Copper River forest services road, between km 2 and 3, approximately 10 km east of Terrace. Impacts of floods and sediments inputs have caused substantial channel changes in floodplain reaches, damaging (industrial) infrastructure. Road and pipeline construction and protective dyking reduced access to and abundance of off-channel rearing and overwintering habitat for coho salmon. Channel excavation was conducted with the aim to establish fish habitat within an ephemeral run off-channel. Multiple ponds were excavated. More notes related to this project can be found here.

Data and Resources

Additional Info

Field Value
Author Triton Environmental Consulting
Maintainer Manuela Zindler
Last Updated April 17, 2025, 16:38 (UTC)
Created October 31, 2024, 18:06 (UTC)
publication_yr 2001