-
Analysis of Water Quality Monitoring in the Morice Water Management Area
The Morice Water Management Area (MWMA) was established in 2007 by the Morice Land and Resource Management Plan with the intent to protect the hydrological integrity, water... -
Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field... -
Northwest Cumulative Effects Case Study
The Northwest pilot has investigated a range of cumulative effect related topics as well as developed methods to assess impacts of industrial development on a selection of... -
Management strategies for climate-change adaptation in the Nadina Forest District
This report presents a preliminary set of strategies for sustainable forest management in the Nadina Forest District in an era of climate change. These “adaptation strategies”... -
Watershed Status Evaluation: An Assessment of 71 Watersheds Meeting BC's...
This pilot project used the WSE Tier I GIS-based methods described in Porter et al. (2013) to assess the watershed indicator “risk” status of 71 watersheds across most of... -
Water Temperature, River Discharge, and Adult Sockeye Salmon Migration...
Water temperature, river discharge, and adult sockeye salmon migration observations in the Babine watershed, 1946-2014. Historical meteorological and hydrological data were... -
Water Monitoring in British Columbia: Scanning the Data Landscape Public Report
The overall goal of this scan is to inform a shared vision for water monitoring and reporting in BC. This scan collected information on surface and groundwater quality and... -
Upper Bulkley Floodplain Habitat: Modifications, Physical Barriers, and...
The Bulkley River upstream of the Morice River has some of the most intense public and private land use in the Skeena watershed. The purpose of this assessment was to document... -
Upper Bulkley Fish and Aquatic Review: Summary of Data, Methodology,...
The Upper Bulkley Fish and Aquatic Review project produced a set of analyses focused on select pressure and quantity indicators as determined by the Wild Salmon Policy Strategy... -
Upper Bulkley Fish and Aquatic Review: Stream Flow, Surface Water Licenses...
Upper Bulkley fish and aquatic review: stream flow, surface water licenses and groundwater wells. The Upper Bulkley Fish and Aquatic Review Project produced a set of analyses... -
Streamflow Trends in the Skeena Region
This report is intended to improve the ability of the proponents of major projects (e.g., mines, run-of-river power projects) and the responsible regulatory agencies to address... -
Skeena Steelhead Conservation Units
The purpose of this project is to provide an update of Skeena steelhead population structure that is more consistent with both the federal methodology and the intent of the wild... -
Skeena Salmon: Lake Sockeye Conservation Unit Snapshot: Maxan
This habitat report card was developed by the Pacific Salmon Foundation with technical support from ESSA Technologies. This project summarizes pressures on habitats used by... -
Project Description Prince Rupert LNG
Prince Rupert LNG Limited (PRLNG) proposes to develop a Liquefied Natural Gas (LNG) facility on Ridley Island at the Port of Prince Rupert British Columbia (BC). The name of the... -
Potential Effects of an Oil Pipeline Rupture on Reach 2 of Morice River: A...
This submission focuses on a portion of the pipeline route that is located adjacent to Morice River, 70 km south of Smithers. It examines the implications of a pipeline rupture... -
Pacific Trail Pipelines Project: Application No.4 to Amend Environmental...
This environmental effects assessment, like the effects assessment provided in the 2007 EAC Application, is a sustainability-based environmental assessment that considers five... -
Northwest Water Tool
The Northwest Water Tool was developed for the Ministry of Forests, Lands and Natural Resource Operations to provide guidance on water availability across northwest BC and to... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information... -
Natural Resource Stewardship Monitoring and Assessment Report for the...
Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data... -
Morrison Copper/Gold Project 3rd Party Review Response Report
This report presents the response to the 3rd Party Review of the Environmental Assessment for the Morrison Copper/Gold Project. The 3rd Party Review was requested by the...