-
Upper Bulkley Water Temperature Monitoring Data and Reports
This dataset comprises water temperature information collected from 15 hydrometric stations in the Upper Bulkley River watershed since 2016. Resources include interpretative reports, a link to an interactive dashboard featuring the results, a monitoring... -
Analysis of Water Quality Monitoring in the Morice Water Management Area
The Morice Water Management Area (MWMA) was established in 2007 by the Morice Land and Resource Management Plan with the intent to protect the hydrological integrity, water quality, water quantity, and fisheries of the upper Morice River watershed. The... -
Upper Bulkley River Riparian Restoration
In effort to ameliorate riparian vegetation and reduce streambank erosion on the Upper Bulkley River, willow cuttings were planted and streambanks stabilized on private land parcels along the banks of the river. Four sites were planted in the Spring of 2021... -
Reconnaissance Level Fish and Fish Habitat Inventories in the Bulkley T.S.A.
These reports summarize the reconnaissance level fish and fish habitat inventories for various locations along the Bulkley River. Sensitive habitats and barriers are discussed, and fish summary tables and images are provided for the creeks examined within... -
Skeena Salmon Conservation Unit Report Cards for Sockeye
These habitat report cards were developed by the Pacific Salmon Foundation with technical support from ESSA Technologies. This project summarizes pressures on habitat used by Skeena salmon for migration, spawning, rearing and incubation, as well as their... -
Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field surveys completed included sampling of fish species assemblages and habitat... -
Fish Passage GIS Analysis Version 2 Methodology and Output Data Specification...
The BC Land Based Investment (LBI) fish passage program is focused on remediating stream crossings that impede freshwater fish migration. The most common barrier to fish is improperly designed and installed closed bottom structures such as culverts.... -
Telkwa Coal Project: Aquatic Resource Assessment 1985
Studies were undertaken during 1984 to evaluate aquatic resources in the Telkwa Project study area in west-central British Columbia. Stream periphyton, invertebrates and fish populations were assessed in Goathorn and Tenas creeks and the lower Telkwa River.... -
Bill Nye Lake - Secondary Lake Inventory
The purpose of this survey is to conduct secondary lake inventories in the southern portions of the Morice and Lakes Forest Districts (Prince Rupert Forest Region). The lake was accessed by helicopter from Houston, British Columbia. Flying time from Houston... -
Zymoetz and Clore River Steelhead Trout: A Report on the 1978 and 1979 Sport ...
This paper presents data collected during a creel census conducted in the years 1978 and 1979, and includes information on angler harvest and success, and life histories of Zymoetz-Clore steelhead. -
Wild Salmon Policy Indicator Analysis for the Kispiox TSA
Wild Salmon Policy indicators including road density, stream crossing density, riparian disturbance, and anthropogenic total land cover alternation (TLCA) were calculated for the Kispiox Timber Supply Area (TSA) using BC freshwater atlas (FWA) assessment... -
WWF - Watershed Report 2020
This report is an update to WWF's initial Canadian-wide assessment of the country's watershed from 2017. This reassessment was only done for the health indicators (flow, water quality, benthic invertebrates and fish) as the threats assessment data sources... -
Upper Skeena and Kispiox River Juvenile Steelhead Surveys 1999
In 1999, the Ministry of Environment, Lands, and Parks surveyed portions of the Upper Skeena River and Kispiox Rivers during September 1999 for juvenile steelhead and fry and parr abundance. This report summarizes the results of those surveys and provides a... -
Upper Bulkley Watershed Reconnaissance July 26, 2018
Photographs and field notes from July 26, 2018 Upper Bulkley River (UBR) Watershed reconnaissance conducted by Cindy Verbeek and Margaret Letkeman. Field descriptions include water and air temperatures, fish observations, and streamflow and channel... -
Upper Bulkley River Steelhead Population Monitoring
The upper Bulkley River system, near Houston, was first assessed by the Fish Habitat Improvement Section in 1981. The initial assessment identified probably areas of importance for steelhead recruitment and juvenile rearing. In 1982 an index sampling... -
Upper Bulkley Fish and Aquatic Review: Summary of Data, Methodology, Results,...
The Upper Bulkley Fish and Aquatic Review project produced a set of analyses focused on select pressure and quantity indicators as determined by the Wild Salmon Policy Strategy 2. Pressure Indicators included are Road Density, Riparian Disturbance, and... -
Upper Bulkley Fish and Aquatic Review: Summary of Data, Methodology, Results,...
The Upper Bulkley Fish and Aquatic Review project (October 2016) produced a set of analyses focused on select pressure and quantity indicators as determined by the Wild Salmon Policy Strategy 2. Pressure Indicators included are Road Density, Riparian... -
Toboggan Creek Coho Smolt Enumerations
The primary focus of the "Toboggan Creek Smolt Project" is to estimate the number of wild coho (0. kisutch) smolts leaving Toboggan Creek. Initiated in the spring of 1995, the study aimed to estimate wild coho populations of Toboggan Creek by comparison... -
Telkwa Coal Project Appendix 8: Geotechnical and Hydrogeological Investigatio...
Piteau Engineering Ltd. (PEL) was retained by Manalta Coal Ltd. (Manalta) to conduct a series of geotechnical and hydrogeological investigations in support of the proposed Telkwa Coal Project near Telkwa, B.C. The work program for this investigation was... -
Telkwa Coal Project Appendix 6: Baseline Data, Surface Water, and Groundwater...
Samples were collected for the first time from a watercourse on the proposed project site on the north side of the Telkwa, and from sites on the Telkwa River and Goathorn Creek which were previously sampled in 1988. Samples were also collected from the...