-
The Resumption of the Babine Lake Watershed Sockeye Smolt Population...
The Babine Lake Watershed is the principal sockeye salmon (Oncorhyncus nerka) rearing area for Skeena River sockeye salmon, producing up to 90% of the sockeye returns to the... -
The Physical Limnology of Lakelse Lake, British Columbia
During the five years, 1944 to 1948, physical and chemical studies were conducted on Lakelse lake, B.C., as part of the programme of salmon research on the Skeena river.... -
The Oceanography of Chatham Sound, British Columbia
This paper is concerned with a detailed analysis of the data obtained during the 1948 oceanographic survey of Chatham Sound that was to determine whether there was any obvious... -
The Morice WFSP-Planning Linkages and Forest Licensee Support
The objectives of this report are to provide: (1) a summary of the challenges and successes faced in integrating the Morice Watershed-based Fish Sustainability Plan (WFSP)... -
The Mission Creek Coho Fence Report 1999
The purpose of the monitoring and enhancement activities is to restore historical salmon runs and to increase public education and awareness of the salmon resource. -
The Maxan Lake Multi-Land Use Study: A Summary Review
The objective of the Maxan Lake multi-land use study was to examine the interaction between various forms of land use on an area having multi-use capacity. To this end, various... -
The Life History of Adult Steelhead Sampled in the Tyee Test Fishery in the...
This report summarizes age, size, and sex for the steelhead sampled at Tyee in four years (1973 - 1976) of test fishing. Comparisons are made with similar information on... -
The Flooded Tailings Impoundment at the Equity Silver Mine
The Equity Silver Mine operated between 1980 and 1994, producing silver, gold, and copper from three open pits and a small underground operation. Mine components include a... -
The Environmental Implications of Sediment Transport in the Waters of Prince...
The Environmental Implications of Sediment Transport in the Waters of Prince Rupert, British Columbia, Canada: A Comparison Between Kinematic and Dynamic Approaches. A Sediment... -
The Economic Value of the Babine River Corridor Park With and Without a...
The Babine River Corridor Park is relatively small in comparison to many other provincial parks in the province. However, the high quality wilderness attributes of the Park,... -
The Distribution of Aquatic Vegetation in Lakelse Lake and the Partitioning...
This report was requested by the regional staff as part of a complete study on Lakelse Lake. There was a need to know the value of aquatic plants, for fish habitat, and their... -
The Commercial Harvest of Salmon in British Columbia 1820-1877
This report reviews archival data on the earliest harvest of Pacific salmon in British Columbia by Europeans, first considering subsistence and export production by the Hudson's... -
The Changing Geography of Salmon Canning in British Columbia 1870-1931
A thesis explaining the changing geography of British Columbia's commercial salmon canning industry between 1870 and 1931. -
The Babine River Watershed: An Annotated Bibliography of Inventory,...
This bibliography was completed to provide an information base to the Babine Watershed Monitoring Group. This group is being established to coordinate monitoring of resource... -
The Age, Size, and Sex Composition of Sockeye in the Escapements to...
For many years, estimates of the abundance of the spawning stock of sockeye salmon to Lakelse Lake have been made and recorded in the Confidential Annual Reports of the... -
The 2000 Synoptic Survey of Juvenile Coho Populations in Selected Lakes and...
This report documents the results of the seventh year of sampling, performed throughout the Skeena River watershed between 14 August and 7 September, 2000. The current study was... -
The 1995 Skeena River Gillnet and Seine Sampling Program
The 1995 Skeena River Fisheries Technician Program was tasked to work on grounds monitoring the area 4 gillnet and special seine fishery. The project was timed to coincide with... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed... -
Tenas Project Public Consultation Plan
The Tenas Project Public Consultation Plan aims to capture past and future engagement activities between Telkwa Coal Limited (TCL) and the local community and stakeholders,... -
Tenas Project Indigenous Consultation and Engagement Plan
The primary purpose of the Indigenous Consultation and Engagement Plan is to describe the approach, methods and activities TCL is proposing to implement to continue its efforts...