Annual Compendium of Aquatic Rehabilitation Projects for the Watershed...
B.C.'s Watershed Restoration Program (WRP) was implemented under the Province's Forest Renewal Plan in mid-1994 in response to a historical lack of mechanisms for ensuring... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the... -
Resource Development in the Upper Zymoetz River Catchment 1995
This report addresses issues concerning the Class I angling water designation of the Zymoetz River. Attributes associated with the Zymoetz River's Class I angling water... -
Reconnaissance Survey of Lakelse Lake
This survey collected information about the fish species that are present in Lakelse Lake, as well as information about the physical characteristics of the lake. This includes... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The... -
Pacific Future Energy Refinery: Project Description
This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information... -
Morice River Stream Survey August 1975
A survey investigating the fish, and especially the steelhead values, of the small feeder creeks of the Morice River was conducted from August 6-15, 1975. The biological data... -
Kitimat - Summit Lake Pipeline Looping Project: Assessment Report
The purpose of this Assessment Report is to: describe the Project; summarize the process for the review of the Application; report on the adequacy of the Proponent’s...