Maxan Watershed Stream Habitat Restoration and Enhancement Level 2 Design...
AGRA Earth & Environmental Limited (AEE) was retained by Dz'ilh K'Az Kwa Development Corporation (DKK) to design stream habitat restoration and enhancement measures in the... -
Annual Compendium of Aquatic Rehabilitation Projects for the Watershed...
B.C.'s Watershed Restoration Program (WRP) was implemented under the Province's Forest Renewal Plan in mid-1994 in response to a historical lack of mechanisms for ensuring... -
Assessment of Steelhead Enhancement Opportunities in the Morice River System
Juvenile salmonid populations in two tributary streams to the Morice River system, Owen and Lamprey Creeks, were assessed by the Fish Habitat Improvement Section in the fall of... -
Fish Passage Assessment of Kispiox Forestry Road Stream Crossing
The purpose of this report is to present background information and survey results for fish passage assessments conducted at Kispiox forestry road stream crossings. The Kispiox... -
Analysis and Priority Identification of Existing Fish Passage Data: Bulkley...
For this project, existing fish passage information in the Bulkley River watershed located near Smithers, British Columbia, was reviewed in order to prioritize and rank culverts... -
Detailed Fish Habitat, Riparian and Channel Assessment for Select Central...
Land use activities have had a significant impact on many of the tributaries within the central Bulkley River watershed. Preliminary air photo analysis has indicated that high... -
Upper Skeena and Kispiox River Juvenile Steelhead Surveys 1999
In 1999, the Ministry of Environment, Lands, and Parks surveyed portions of the Upper Skeena River and Kispiox Rivers during September 1999 for juvenile steelhead and fry and... -
Toboggan Creek: a Report on the Results of Field Work Undertaken by the...
In 1978 the Bulkley Valley Steelhead Society obtained a $1,000 grant under the Salmonid Enhancement Program to construct and operate a counting fence and fish trap on Toboggan... -
Toboggan Creek Watershed Restoration Project
These reports present the information found during the Toboggan Creek Watershed Restoration Project. This project assessed the historical background of the watershed, including... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Stream Inventory: Fenton Creek and Adjacent Tributaries 1997
This survey provides an assessment of fish presence/absence in Fenton Creek and its adjacent tributaries. It identifies stream gradients and reasons for obstructed fish passage,... -
Results of the Kloiya River Resistivity Counter
The objective of this study was to quantify juvenile steelhead abundance and estimate values for habitat capacity thresholds. In 2005, the Ministry of Environment (MoE) began... -
Reconnaissance (1:20,000) Fish and Fish Habitat Stream Inventory Re-Sampling...
The main objectives of the 1:20,000 fish and fish habitat reconnaissance level stream inventory project in lower Buck Creek watershed were: to review and summarize historical... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The... -
Pacific Fisheries Resource Conservation Council: Freshwater Habitat
This report discusses the attempts that British Columbians are making in the effort to protect and manage salmon habitat. They also describe the relevant legislation, policy,... -
Morice River Stream Survey August 1975
A survey investigating the fish, and especially the steelhead values, of the small feeder creeks of the Morice River was conducted from August 6-15, 1975. The biological data... -
Mid-Bulkley Overview Fish and Fish Habitat Assessment for Watershed Restoration
An overview fish and fish habitat assessment in the sub-basins of the Mid-Bulkley Watershed that: determines what fish species are at risk to the impacts of poor land-use... -
Marine Fish and Fish Habitat Technical Data Report: Proposed Aurora LNG Project
This Technical Data Report (TDR) presents information on existing conditions for marine fish and fish habitats within local and regional assessment areas. The purpose of the TDR... -
Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed
This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose... -
Davidson Project: Application for Environmental Assessment Certificate
This underground mining project will be located in the Bulkley-Nechako Regional District and in the traditional territory of the Wet'suwet'en people. Included in this dataset...