-
Measuring progress on adaptation and climate resilience: recommendations to t...
To help to overcome the challenges associated with climate change in Canada, actions to adapt and build climate resilience are being carried out across the country. The Expert Panel on Climate Change Adaptation and Resilience Results was launched by the... -
Letter from Canadian Environmental Assessment Agency Fisheries for the Aurora...
The Canadian Environmental Assessment Agency (the Agency) is writing to inform Fisheries and Oceans Canada that in performing the duties and functions of the responsible authority for the environmental assessment (EA) of the proposed Aurora LNG Project (the... -
Lakelse 1937 Historical Air Photo Archive (3 of 3 Datasets)
This dataset contains the 1937 mosaic of the Lakelse area and corresponding air photo scans belonging to Phase II of the collaborative WWF-UBC Skeena Historical Land Use Change and Ecological Function Project. This project entailed collecting air photos at... -
Lakelse 1937 Historical Air Photo Archive (2 of 3 Datasets)
This dataset contains the 1937 mosaic of the Lakelse area and corresponding air photo scans belonging to Phase II of the collaborative WWF-UBC Skeena Historical Land Use Change and Ecological Function Project. This project entailed collecting air photos at... -
Lakelse 1937 Historical Air Photo Archive (1 of 3 Datasets)
This datasets contains the 1937 mosaic of the Lakelse area and corresponding air photo scans belonging to Phase II of the collaborative WWF-UBC Skeena Historical Land Use Change and Ecological Function Project. This project entailed collecting air photos at... -
Khyex-Tyee: Foreshore Habitat Re-construction Works
This report documents the foreshore habitat compensation works constructed by the Ministry of Transportation and Highways as part of the Highway 16 reconstruction project, located near Prince Rupert, B.C. -
Impacts of LNG Development to Salmon Habitat on Lelu Island and Flora Bank
This report outlines the unaddressed issues that remain after the mitigation proposal presented by Petronas for a suspension bridge over Flora Bank. -
Historical Data Review on the Upper Bulkley River
This report gathers relevant data on water level and flow, along with water use (allocation or licenses), and historical stream hydrological information, and to assist in determining if these factors are contributing to the decline of coho in the system. -
Highway #16 Fish Passage Assessment in Middle Skeena Watershed
The purpose of this report is to present results and background information for the Middle Skeena Watershed fish passage assessment along Highway #16. In July 2004 the Skeena Fisheries Commission was retained by the Department of Fisheries and Oceans,... -
Fairview Terminal Phase II Expansion Project Comprehensive Study Report
The Prince Rupert Port Authority (PRPA) and Canadian National Railway Company (CN) are proposing the construction and operation of a wharf extension and expanded container and intermodal facilities at the existing Fairview Terminal and the construction and... -
Ongoing Legacy of Metal Mines on Babine Lake
An assessment of discharge regulation, aquatic monitoring, and aquatic impacts related to Bell and Granisle Mines. -
Ridley Island Export Logistics Park Project Environmental Effects Evaluation
Environmental effects evaluation for the Ridley Island Export Logistics Park Project. The project is an export logistics platform that is intended to enhance the Port of Prince Rupert's export transloading capacity and improve operational logistics. -
Mid Skeena Watershed Restoration Effectiveness Monitoring
In 2006, Gitksan Watershed Authorities was retained by the Pacific Salmon Commission to conduct an effectiveness monitoring in three Mid Skeena sub-basins: the Kispiox, Kitseguecla, and the Suskwa. This watershed restoration effectiveness monitoring... -
Fairview Container Terminal Expansion Project Description
Project description of the Fairview Container Terminal in Prince Rupert, BC. -
Grassy Point LNG-Dome Environmental Assessments
Environmental assessments, risk analysis, and proposals for the development of a LNG terminal facilities at Grassy Point. -
Environmental Review of Proposed Port Development in Prince Rupert, B.C.
This report suggests possible port locations in the Prince Rupert area and has formed the basis for subsequent environmental studies. -
District of Port Edward Sewerage Study
The purpose of this study is to develop a conceptual design for transporting sewage from the District of Port Edward to Skeena Cellulose Mill for joint treatment and disposal. -
Current and Proposed Mining, Energy, and Forestry Development in Northwest Br...
Map showing salmon habitat overlain with current and proposed infrastructure development in northwest BC. Infrastructure includes roads, forestry cutblocks, mines, transmission lines, pipelines, transmission lines, major projects, agricultural land tenures,... -
Cow Bay, Prince Rupert Development & Enhancement Plan
Reports and correspondence related to development plans, enhancement plans, and habitat assessment of Lot 17 in Cow Bay, Prince Rupert. -
Conserving Kispiox Fish Populations and their Habitat
This report was prepared for the Kispiox Watershed-based Fish Sustainability Plan (KWFSP) planning table. It briefly describes the origin, purpose, and benefits of Watershed-based Fish Sustainability Planning (WFSP), a four-stage planning sequence that...