Skeena Steelhead & Salmon: A Report to Stakeholders
This report documents the status of the Skeena River steelhead and salmon populations, and chronicles the effort to make conservation the first priority in the management of the... -
Copper River Watershed Restoration Program: Site 9 Berm Removal
Site 9 is a 300 m long groundwater channel that was excavated in 1998 within a flood channel to the Copper River, adjacent to 3 km along the Copper Forest Service Road. This... -
Copper River Watershed Restoration Program: 3 km off-channel construction
One project aim was the improvement of fish habitat. The site is located adjacent to the Copper River forest services road, between km 2 and 3, approximately 10 km east of... -
Copper River Watershed Restoration Program: Debris Catcher Construction
Goals of the project included the improvement of fish habitat and educational purposes such as showing debris catchers as alternatives to traditional riprap bank protection for... -
Beaver Dam Mitigation and Nuisance Beaver Control
In 2023, the Gitanyow Fisheries Authority (GFA) was contracted by the BC Ministry of Forests to manage beaver dam mitigation and control in the Kitwanga and Nass watersheds. The... -
Maxan Watershed Stream Habitat Restoration Works 1998/99
This report included Habitat Restoration Prescriptions for 12 sites on the Bulkley River, 2 sites on Foxy Creek, and 1 site on lower Maxan Creek. -
Maxan Watershed Stream Habitat Restoration and Enhancement Level 2 Design...
AGRA Earth & Environmental Limited (AEE) was retained by Dz'ilh K'Az Kwa Development Corporation (DKK) to design stream habitat restoration and enhancement measures in the... -
1st Avenue Culvert Replacements Lakelse Lake
The project focused on the replacement of eleven culverts along 1st Avenue at Lakelse Lake to improve fish passage. -
Spring Creek Habitat Restoration Project
The Spring Creek Habitat Restoration Project was initiated under the Habitat Restoration Salmonid Enhancement Program to develop or improve coho salmon habitat in the Spring... -
Richfield Creek Riparian Exclusion Fencing and Restoration
Richfield Creek was included in a larger riparian restoration initiative in 2021 through the Morice Water Monitoring Trust (see dataset: Upper Bulkley Riparian Restoration). The... -
Kumealon Creek Instream Construction
Two instream rehabilitation projects were implemented in Kumealon Creek, located 56 km south of Prince Rupert. The site is only accessible by boat or air. The creek has high... -
Waterfall Creek Enhancement Project 2000
A restoration/rehabilitation plan was developed that recommended and initiated measures to address community concerns by supplying survey and design for rehabilitation work,... -
Nilkitkwa River Fish Passage Restoration
Assessment found that a pre-code fish crossing on an unnamed stream in the Nilkitkwa river watershed acted as a partial barrier to juvenile fish passage upstream due to high... -
Glacier Creek Fan Stabilization
This restoration project aimed to improve and stabilize the Glacier Creek fan located at the confluence of the Kitsumkalum River and Glacier Creek. -
Cranberry and Kitwanga Rivers Fish Passage Inspection and Restoration projects
A series of 5 studies on the Kitwanga & Cranberry rivers pertaining to fish passage crossings and water quality evaluations. The first four studies were focused on... -
As-built Report of Fish Passage Improvement Projects within the Wet'suwet'en...
This report describes the fish passage restoration projects completed at three high-priority sites on the upper Bulkley River within Wet'suwet'en First Nation territory in 2017.... -
As-built Report of Aquatic Restoration and On-farm Cattle Management...
This report describes the as-built aquatic habitat restoration projects undertaken at four high-priority sites along the upper Bulkley River within Wet'suwet'en First Nation... -
Deep Creek Side Channel and Bank Stabilization
The Deep Creek side channel and bank stabilization project is intended as a demonstration project to create off-channel rearing and overwintering habitats for salmonids... -
As-built Report of Aquatic Restoration and On-farm Cattle Management...
This report describes the aquatic habitat restoration construction completed at the lower Craker Road site and repairs completed to two instream structures within the upper... -
Upper Bulkley River Riparian Restoration
In effort to ameliorate riparian vegetation and reduce streambank erosion on the Upper Bulkley River, Maxan Creek and Richfield Creek, willow cuttings were planted and...