  • Review of Cattle-Community Watershed Conflicts in the Skeena Region

    This report provides the B.C. Ministry of Environment, Lands & Parks (BCE) with a review of cattle farming in the Skeena Region, and a recommendation for monitoring the impact of cattle and other livestock operations on community watersheds, including...
  • Technical Data Reports for Enbridge Northern Gateway Project

    Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field surveys completed included sampling of fish species assemblages and habitat...
  • Fisheries Problems Associated with the Development of Logging Plans within th...

    This report has been prepared primarily to describe the fisheries problems associated with a large scale logging operation proposed for the system and to outline certain proposals which are considered necessary for the protection of the salmon resource of...
  • Davidson Project Meteorology and Hydrology Baseline Report 2006-2008

    This meteorology and hydrology baseline report summarizes results from 2006, 2007, and 2008 from the Davidson meteorology station and for 6 hydrometric stations established for the Davidson Project. It also includes available data from government operated...
  • Wet'suwet'en Rights and Title and Enbridge's Northern Gateway Pipelines Project

    The Office of the Wet'suwet'en (OW) presents this submission to the Northern Gateway Joint Review Panel. This submission is a component of the Wet'suwet'en response in respect of the proposed Northern Gateway project within Wet'suwet'en territory. The...
  • Waterfall Creek Enhancement Project 2000

    A restoration/rehabilitation plan was developed that recommended and initiated measures to address community concerns by supplying survey and design for rehabilitation work, while providing community involvement and focus through trail development and...
  • Water Quality in British Columbia Objectives Attainment

    The setting of water quality objectives in priority basins in British Columbia began in 1982. By the end of 2002, the Ministry of Water, Land, and Air Protection had set water quality objectives in 51 areas or basins and updated them throughout the...
  • Water Management at Equity Silver Mines Ltd.

    Predominantly all wastes, both tailing and blasted rock, contain pyrite and are classified acid generating. Acid generation occurs within waste rock fills around the property however not within tailing thus far due to sub- aqueous disposal of the product....
  • Value of the Fisheries Resources in the Bulkley River System

    The purpose of this report is to provide an indication of the net economic value of the fisheries stocks in the Bulkley river system. This is done by assessing current and future values of recreational, commercial and, to some degree, Indigenous fishing...
  • Upper Bulkley River Steelhead Population Monitoring

    The upper Bulkley River system, near Houston, was first assessed by the Fish Habitat Improvement Section in 1981. The initial assessment identified probably areas of importance for steelhead recruitment and juvenile rearing. In 1982 an index sampling...
  • The Flooded Tailings Impoundment at the Equity Silver Mine

    The Equity Silver Mine operated between 1980 and 1994, producing silver, gold, and copper from three open pits and a small underground operation. Mine components include a flooded tailings impoundment constructed from till and waste and quarried rock. This...
  • Tenas Project: Project Description

    Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in...
  • Tenas Project 2017-2018 Baseline Report Final

    This consolidated baseline report aims to provide information on field programs and their respective field summaries for the the 2017 to spring 2018 programs of the Tenas Project.
  • Tenas Project 2017-2018 Baseline Report Draft

    This consolidated baseline report aims to provide information on field programs and their respective field summaries for the the 2017 to spring 2018 programs of the Tenas Project.
  • Site Specific Risk Assessments of Two Former Copper Concentrate Shed Sites Ne...

    In summary, the risk assessments identified COCs in soil that may have potential to cause adverse effects, especially to soil invertebrates and plants, although this is principally a theoretical risk owing to important habitat limitations in the most...
  • Sampling of Metals and Aquatic Life in the Bulkley River Adjacent to the Form...

    This study was carried out to monitor the effects, if any, of the former Topley Concentrate Shed Site ("Topley Site") on concentrations of dissolved and total metals and other parameters and on aquatic life in the Bulkley River. The study included three...
  • Riparian and In-Stream Assessment of the Bulkley River System: An Examination...

    Sixty-eight tributaries to the Bulkley River were examined by topographic maps and air photo interpretation to assess the degree and nature of the impacts on these streams by transportation and hydro-electric powerline corridors and...
  • Pollution Tracker

    PollutionTracker currently provides a high quality coast-wide baseline dataset. The pollutants detected in Phase 1 samples are a reflection of a variety of sources, including local urban and industrial inputs to the marine environment (e.g., wastewater and...
  • Pacific Trail Pipelines Application Volume II: Baseline Studies

    These baseline studies cover the following topics with regards to the impacts of the Pacific Trail Pipeline: acid rock drainage and metal leaching, acoustic environment, air quality, archaeology, contaminated sites, fish and fish habitats, forestry,...
  • Pacific Northwest LNG: Project Description

    Pacific NorthWest LNG Limited Partnership (PNW LNG) is proposing to construct and operate a liquefied natural gas (LNG) export facility within the District of Port Edward, British Columbia (BC). This report outlines the procedures and plans for the...