Pacific Fisheries Resource Conservation Council: Freshwater Habitat
This report discusses the attempts that British Columbians are making in the effort to protect and manage salmon habitat. They also describe the relevant legislation, policy, and regulation, science and technology, as well as government and "stakeholder"... -
Northwest Transmission Line EAO Inspection Records
Environmental Assessment Office inspection records for the Northwest Transmission Line project. The Environmental Assessment Office (Chris PARKS, Compliance Officer) completed an inspection of portions of the Northwest Transmission Line Project against... -
Morrison Copper/Gold Mine Project Third Party Review of Groundwater, Water Qu...
EAO wishes to retain an independent, expert, third party consultant to undertake a technical review of the hydrogeology, hydrology, water balance, water quality, and related aquatic resources and fisheries components of the EA, in particular with a focus on... -
Morice Lake Nutrient Samples
Nutrient samples (surface) were collected at four intervals at 11 stations on Morice Lake during the period June 1973 to September 1973. The samples were analyzed to determine mean concentrations of total phosphorus, Nitrogen, and Ammonia. -
Lower Skeena Fish Passage: Closed Bottom Structure Assessments 2009
This project included the planning, data collection and analysis phases of closed bottom structure assessments for the purpose of identifying fish passage barriers in need of restoration within the Lower Skeena priority area. The purpose of the project is... -
Letter from Canadian Environmental Assessment Agency Fisheries for the Aurora...
The Canadian Environmental Assessment Agency (the Agency) is writing to inform Fisheries and Oceans Canada that in performing the duties and functions of the responsible authority for the environmental assessment (EA) of the proposed Aurora LNG Project (the... -
Lakelse Lake Sockeye Rehabilitation Program
In 2005 and 2006, DFO worked with multiple stakeholders to develop the Lakelse Sockeye Recovery Plan in an attempt to halt the estimated 92% decline in this stock that was observed from around 1990 through 2002. The recovery plan identified stable sockeye... -
Lakelse Lake Draft Management Plan
The lake management planning process devises methods “to preserve and protect the quality and health of the Lakelse watershed”. This management plan marks the end of the first iteration of the process, and is intended to provide long- term direction to the... -
Lakelse Lake Cutthroat Trout: Enhancement Opportunity Survey, 1983-84
This report provides basic information on production capabilities for cutthroat trout in streams tributary to Lakelse Lake and to thereby identify enhancement opportunities available to lake cutthroat populations in 1983-1984. -
Lakelse Lake Development Capacity
This report shows the results from various analyses such as Boat Limit Method, Shoreline Development Method, Chlorophyll-a Limiting Method, Morpheodaphic and Other Parameters Method to assess the capacity of Lakelse Lake for development. -
Lakelse 2060: A 50 Year Vision for the Lakelse Watershed
The projects in this report are planning exercises based upon the simple thesis, “If you want this specific value in 50 years (be it swimming or water quality or grizzly bears), these are the requirements for that value which must be in place in order for... -
Kitwanga Sockeye Recovery Plan Backgrounder
Kitwanga sockeye abundance has been in decline for the last five decades. Constraints to sockeye production are not well understood; it is thought they stem from a combination of problems that include high harvest rates in the management of the Skeena River... -
Juvenile Salmonid Habitat Utilization in the Skeena River Estuary
This report examines the salmon habitat utilization of five species of Pacific salmon in the greater Skeena River estuary. In particular, interest is given in salmon habitat utilization in light of several large-scale industrial development projects pending... -
Juvenile Salmon Usage of the Skeena River Estuary
This paper examines the geographic and temporal habitat utilization of juvenile anadromous salmon in the greater Skeena estuary in relation to the footprints of the proposed industrial development projects. These data can help illuminate the current status... -
Implementing a Freshwater Salmon Habitat Monitoring Program in the Skeena Wat...
This project develops a framework for implementing a collaborative freshwater salmon habitat-monitoring program in the Skeena watershed. Its purpose is to help catalyze federal Wild Salmon Policy strategy 2 implementation and stimulate ecosystem based... -
Grassy Point LNG-Dome Environmental Assessments
Environmental assessments, risk analysis, and proposals for the development of a LNG terminal facilities at Grassy Point. -
Goldcorp Canada Ltd - Equity Division Environmental Report
This report has been prepared in support of the Ministry of Environment permit P.E.4475 and the Ministry of EMNG reclamation permit M-114. This report focuses on the environmental performance of Goldcorp Canada Ltd – Equity Division during 2012. -
Environmental Studies on the Morice-Nanika Watershed Interim Report (1975)
B.C. Hydro has proposed developing various resources for meeting future electric power requirements of the province. The main resources included are: hydro-electric power, coal, oil, natural gas, wood waste, and geo-thermal power. Prior to any development... -
Environmental Review of Proposed Port Development in Prince Rupert, B.C.
This report suggests possible port locations in the Prince Rupert area and has formed the basis for subsequent environmental studies. -
Cow Bay, Prince Rupert Development & Enhancement Plan
Reports and correspondence related to development plans, enhancement plans, and habitat assessment of Lot 17 in Cow Bay, Prince Rupert.