1998 Stream Inventory Report Gosnell Creek Watershed
This report presents an overview of the key results of the fish and habitat sampling program including fish distribution, abundance, life history information and a comparison to... -
Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field... -
Movement patterns, timing of migration and genetic population structure of...
This thesis aims to determine if bull trout within a single large watershed show multiple life history forms, if their movement is influenced by environmental variables of... -
Reconnaissance (1:20,000) Fish and Fish Habitat Stream Inventory Re-Sampling...
The main objectives of the 1:20,000 fish and fish habitat reconnaissance level stream inventory project in lower Buck Creek watershed were: to review and summarize historical... -
Reconnaissance Level Fish and Fish Habitat Inventories in the Bulkley T.S.A.
These reports summarize the reconnaissance level fish and fish habitat inventories for various locations along the Bulkley River. Sensitive habitats and barriers are discussed,... -
Analysis and Priority Identification of Existing Fish Passage Data: Bulkley...
For this project, existing fish passage information in the Bulkley River watershed located near Smithers, British Columbia, was reviewed in order to prioritize and rank culverts... -
Upper Zymoetz (Copper River) WRP Overview Fish and Riparian Assessment
This report summarizes fish and fish habitat values within the Copper River watershed and describes impacts to both the fisheries resource and riparian habitats regulating from... -
Fish Passage Culvert Inspections
This project was implemented to assess fish passage at culvert-bearing stream crossings. These assessments were carried out at culvert crossings installed on fish-bearing... -
Conserving Skeena Fish Populations and their Habitat
This report constitutes the Skeena Watershed Fish Sustainability Process Stage I document. Conserving Skeena Fish Populations and Their Habitat describes the planning process... -
Conserving Morice Watershed Fish Populations and their Habitat: Stage II...
This report addresses Stage II of the Watershed-based Fish Sustainability Planning process by developing the biophysical profile of the Morice Watershed. Stage II produced a... -
Wet'suwet'en Title & Rights and Coastal GasLink
The Office of the Wet'suwet'en (OW) presents this submission to British Columbia Environmental Assessment Agency (BC EAO). This submission is a component of the Wet'suwet'en... -
Wet'suwet'en Rights and Title and Enbridge's Northern Gateway Pipelines Project
The Office of the Wet'suwet'en (OW) presents this submission to the Northern Gateway Joint Review Panel. This submission is a component of the Wet'suwet'en response in respect... -
Upper Skeena and Kispiox River Juvenile Steelhead Surveys 1999
In 1999, the Ministry of Environment, Lands, and Parks surveyed portions of the Upper Skeena River and Kispiox Rivers during September 1999 for juvenile steelhead and fry and... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the... -
Skeena Fish Populations and their Habitat
This report is a follow-up to an earlier volume (Gottesfeld et al. 2002) which was prepared as part of the Skeena Watershed Fish Sustainability Plan process. The earlier report,... -
Skeena Bulkley RMP: Enhancing Environmental Values
The Skeena Bulkley RMP was originally developed in 1999 and has been refined and updated annually. This document is the third section of the overall Skeena Bulkley RMP, and... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The... -
Pacific Trail Pipelines Application Volume II: Baseline Studies
These baseline studies cover the following topics with regards to the impacts of the Pacific Trail Pipeline: acid rock drainage and metal leaching, acoustic environment, air...