-
Reconnaissance Level Fish and Fish Habitat Inventories in the Bulkley T.S.A.
These reports summarize the reconnaissance level fish and fish habitat inventories for various locations along the Bulkley River. Sensitive habitats and barriers are discussed,... -
Analysis and Priority Identification of Existing Fish Passage Data: Bulkley...
For this project, existing fish passage information in the Bulkley River watershed located near Smithers, British Columbia, was reviewed in order to prioritize and rank culverts... -
Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field... -
Detailed Fish Habitat, Riparian and Channel Assessment for Select Central...
Land use activities have had a significant impact on many of the tributaries within the central Bulkley River watershed. Preliminary air photo analysis has indicated that high... -
Conserving Skeena Fish Populations and their Habitat
This report constitutes the Skeena Watershed Fish Sustainability Process Stage I document. Conserving Skeena Fish Populations and Their Habitat describes the planning process... -
Wet'suwet'en Title & Rights and Coastal GasLink
The Office of the Wet'suwet'en (OW) presents this submission to British Columbia Environmental Assessment Agency (BC EAO). This submission is a component of the Wet'suwet'en... -
Wet'suwet'en Rights and Title and Enbridge's Northern Gateway Pipelines Project
The Office of the Wet'suwet'en (OW) presents this submission to the Northern Gateway Joint Review Panel. This submission is a component of the Wet'suwet'en response in respect... -
Toboggan Creek Watershed Restoration Project
These reports present the information found during the Toboggan Creek Watershed Restoration Project. This project assessed the historical background of the watershed, including... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the... -
Sustut River Steelhead Investigations, 1986
The Sustut River, situated approximately 200 km north of Smithers, remains as the last major tributary of the Skeena to be investigated. It supports significant populations of... -
Stream Inventory: Fenton Creek and Adjacent Tributaries 1997
This survey provides an assessment of fish presence/absence in Fenton Creek and its adjacent tributaries. It identifies stream gradients and reasons for obstructed fish passage,... -
Salmonid Resource Analysis for the Fort St. James Land and Resource...
This document presents the available salmonid resource information as well as the status of development activity and physiographic conditions within the Skeena River basin... -
Salmonid Habitat Sensitivity Mapping Morice Forest District: Summary Report
In 1997, the British Columbia Conservation Foundation (BCCF) was contracted by the Department of Fisheries and Oceans (DFO) to produce a map that would allow licensees and... -
Reconnaissance (1:20,000) Fish and Fish Habitat Stream Inventory Re-Sampling...
The main objectives of the 1:20,000 fish and fish habitat reconnaissance level stream inventory project in lower Buck Creek watershed were: to review and summarize historical... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The... -
Pacific Trail Pipelines Application Volume II: Baseline Studies
These baseline studies cover the following topics with regards to the impacts of the Pacific Trail Pipeline: acid rock drainage and metal leaching, acoustic environment, air... -
Pacific Future Energy Refinery: Project Description
This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will... -
Nisga'a Lands Freshwater Fish and Fish Habitat Technical Data Report for the...
This report summarizes field data collected in 2014 for fish and fish habitat along the proposed application corridors within Nisga’a Lands. Fish and fish habitat information...