Vopak Pacific Canada Project Description
The purpose of the Project is to provide berthing and loading facilities for bulk liquid cargo that will be received via the existing rail loop on Ridley Island. Due to the... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the... -
Review of the Hydrology, Geomorphology, Ecology & Management of the Skeena...
Review of the hydrology, geomorphology, ecology and management of the Skeena River floodplain. This review of the natural and human history of the floodplain of the lower Skeena... -
Reconnaissance Geochemical Soil Survey and Reconnaissance Geological Survey...
The purpose of the reconnaissance geological survey was to determine whether the board band of favourable volcanic host rocks seen on the northwest section of the Topley... -
Pacific Trail Pipelines Project: Application to Amend Environmental...
This environmental assessment, like the effects assessment contained in the original 2007 EAC Application, is a sustainability-based environmental assessment that considers the... -
Pacific Trail Pipelines Project: Application No.4 to Amend Environmental...
This environmental effects assessment, like the effects assessment provided in the 2007 EAC Application, is a sustainability-based environmental assessment that considers five... -
Pacific Future Energy Refinery: Project Description
This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information... -
Northwest Transmission Line Project: Assessment Report
This Assessment Report considers the proposed project's potential to cause significant adverse environmental, social, economic, heritage, and health effects. It identifies... -
Kitimat - Summit Lake Pipeline Looping Project: Assessment Report
The purpose of this Assessment Report is to: describe the Project; summarize the process for the review of the Application; report on the adequacy of the Proponent’s...