-
Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field... -
An Investigation of the Condition of Kathlyn Lake, with Suggestions for...
As early as 1970, and continuing into the year 1973, concerned citizens of the Smithers area brought to the attention of the Water Resources Services the fact that nuisance weed... -
Chemical, Biological and Physical Characteristics of Lakelse Lake
The chemical, biological and physical characteristics of Lakelse Lake, B.C., were investigated during 1974-1975. This report also summarizes relevant fisheries - limnological... -
A Paleolimnological Assessment
Assessment of Changes in Total Phosphorus in Lakelse Lake, BC in 2002. Sediment cores were retrieved from the North and South basins from Lakelse Lake and shipped to Queen's... -
Westcoast Energy Inc Fireweed Offload Pipeline Project: Fisheries Habitat Assessment
This pre-impact habitat assessment was conducted on June 30, 1994 to identify and evaluate fish habitat along the proposed route associated with this project. -
Water Resources Service Pollution Control Branch - Lakelse Lake Water Quality Study
A comprehensive water quality limnology study in Lakelse Lake was completed by the Pollution Control Branch in 1973 - 74. The expressed purpose of this study, as developed by... -
Upper Skeena and Kispiox River Juvenile Steelhead Surveys 1999
In 1999, the Ministry of Environment, Lands, and Parks surveyed portions of the Upper Skeena River and Kispiox Rivers during September 1999 for juvenile steelhead and fry and... -
The Distribution of Aquatic Vegetation in Lakelse Lake and the Partitioning...
This report was requested by the regional staff as part of a complete study on Lakelse Lake. There was a need to know the value of aquatic plants, for fish habitat, and their... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Telkwa Coal Project Appendix 12: Aquatic Resource Assessment 1985
Studies were undertaken during 1984 to evaluate aquatic resources in the Telkwa Project study area in west-central British Columbia. Stream periphyton, invertebrates, and fish... -
Stream Inventory - Thautil River Watershed
An aquatic stream inventory was conducted in the Thautil River Watershed in the Morice Forest District during the summer and fall of 1996. This report presents an overview of... -
Skeena Environmental Effects Monitoring (EEM) Pre-Design Reference Document
This document provides a basis for the design phase of an environmental effects monitoring program (EEM) for Repap's pulp and paper mill, Skeena Cellulose Inc., located near... -
Reconnaissance Survey of Twin Lake
Klohn-Crippen Consultants Ltd. was retained by the Fisheries Branch of the BC Ministry of Environment, Lands and Parks in Smithers (MELP), British Columbia, to conduct a... -
Reconnaissance Survey of Torkelsen Lake
This report contains information about Torkelsen Lake habitat quality. The data presented in this document includes information regarding aquatic vegetation, terrain features,... -
Reconnaissance Survey of Bristol Lake
This report contains information about Bristol Lake habitat quality. The data presented in this document includes information regarding aquatic vegetation, terrain features,... -
Reconnaissance Inventory of Chrisholm Lake
This report contains information about Chrisholm Lake habitat quality. The data presented in this document includes information regarding aquatic vegetation, terrain features,... -
Reconnaissance Inventory of Aconitum Lake
This report contains information about Aconitum Lake habitat quality. The data presented in this document includes information regarding aquatic vegetation, terrain features,... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The... -
Pacific Trail Pipelines Application Volume II: Baseline Studies
These baseline studies cover the following topics with regards to the impacts of the Pacific Trail Pipeline: acid rock drainage and metal leaching, acoustic environment, air... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information...