-
Wet'suwet'en Rights and Title and Enbridge's Northern Gateway Pipelines Project
The Office of the Wet'suwet'en (OW) presents this submission to the Northern Gateway Joint Review Panel. This submission is a component of the Wet'suwet'en response in respect... -
West Babine Sustainable Resource Management Plan
This dataset contains the West Babine Sustainable Resource Management Plan and associated maps and spatial data. The West Babine Sustainable Resource Management Plan (SRMP) has... -
Water Quality in the Toboggan Creek Watershed 1996-1998: Are Land Use...
FO Habitat and Enhancement Branch initiated water quality monitoring in Toboggan Creek watershed in early 1996. Toboggan Creek is an important nursery stream for both wild and... -
Vopak Pacific Canada Project Description
The purpose of the Project is to provide berthing and loading facilities for bulk liquid cargo that will be received via the existing rail loop on Ridley Island. Due to the... -
Trout Creek/Kitseguecla Landscape Unit Plan
The Trout Creek Landscape Unit Plan (LUP) outlines the objectives and the strategies for the resource management of the Trout Creek and Toboggan watershed within the Bulkley... -
The Morice WFSP-Planning Linkages and Forest Licensee Support
The objectives of this report are to provide: (1) a summary of the challenges and successes faced in integrating the Morice Watershed-based Fish Sustainability Plan (WFSP)... -
The Flooded Tailings Impoundment at the Equity Silver Mine
The Equity Silver Mine operated between 1980 and 1994, producing silver, gold, and copper from three open pits and a small underground operation. Mine components include a... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Technical and Management Proposal: Impact of Coal Dust on Marine Environment...
The report contains a concise summary report outlining the findings of this study on the potential impact of coal and coal contaminated sediments on marine life. -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the... -
Sustaining Lakelse Lake
A brief summary and visual results to natural resources and perks in Lakelse Lake. -
Surface Freshwater Quality Technical Data Report: Proposed Aurora LNG Project
This technical data report presents the results of the surface freshwater acidification and eutrophication assessment including a description of field surveys, methods, and... -
Superport Development Preliminary Environmental Effect Assessment
A preliminary environmental effects assessment relating to the potential port sites identified in the Port Development Study by Wright Engineers Limited for the National... -
Summary of Construction Monitoring at PNG's Maxan Creek Crossing
This is a short report explaining the repair process of an exposed pipeline. -
Steelhead Stock Assessment, 1983
Management prescriptions for specific waters have been identified. In most situations, these have or will be incorporated into the production program. The immediate future of... -
Skeena Salmon: Lake Sockeye Conservation Unit Snapshot: Maxan
This habitat report card was developed by the Pacific Salmon Foundation with technical support from ESSA Technologies. This project summarizes pressures on habitats used by... -
Skeena Region Fisheries Management Statement
The purpose of this regional planning statement is to provide long term direction for fisheries management in the Skeena region. This is accomplished through analysis of fish... -
Skeena Historical Land Use Change and Ecological Function Project: Final Report
The following report describes the final phase (Phase II) of the collaborative WWF-UBC Skeena Historical Land Use Change and Ecological Function Project. This project entailed... -
Skeena Environmental Effects Monitoring (EEM) Pre-Design Reference Document
This document provides a basis for the design phase of an environmental effects monitoring program (EEM) for Repap's pulp and paper mill, Skeena Cellulose Inc., located near...