Morice Water Management Area - Multi-Year Operational Plan
This operational plan is the initial product of a partnership between the Office of the Wet’suwet’en and the Province of British Columbia to develop a water monitoring and... -
Morice Land and Resource Management Plan
The Morice LRMP provides policy direction on the management of land and resources in the Morice LRMP area, and provides direction for the establishment of landscape level legal... -
Mid-Bulkley Overview Fish and Fish Habitat Assessment for Watershed Restoration
An overview fish and fish habitat assessment in the sub-basins of the Mid-Bulkley Watershed that: determines what fish species are at risk to the impacts of poor land-use... -
Mid-Bulkley Detailed Fish Habitat/Riparian/Channel Assessment for Watershed...
The Fish Habitat and Assessment Procedure (FHAP) is a means of assessing watersheds with a history of anthropogenic activity for impacts to fish and fish habitats using a set of... -
Lower Skeena Fish Passage: Closed Bottom Structure Assessments 2009
This project included the planning, data collection and analysis phases of closed bottom structure assessments for the purpose of identifying fish passage barriers in need of... -
Letter from Canadian Environmental Assessment Agency Fisheries for the...
The Canadian Environmental Assessment Agency (the Agency) is writing to inform Fisheries and Oceans Canada that in performing the duties and functions of the responsible... -
Lakelse River Watershed - Review of Existing Information
This report reviews existing water, fisheries, and land-use related information for the Lakelse River watershed, considered for Fisheries Sensitive Watershed designation. This... -
Lakelse Literature Database
Environmental literature database for Lakelse Lake surrounding fish habitat and water quality. -
Lakelse Lake Draft Management Plan
The lake management planning process devises methods “to preserve and protect the quality and health of the Lakelse watershed”. This management plan marks the end of the first... -
Lakelse Lake Development Capacity
This report shows the results from various analyses such as Boat Limit Method, Shoreline Development Method, Chlorophyll-a Limiting Method, Morpheodaphic and Other Parameters... -
Lakelse 2060: A 50 Year Vision for the Lakelse Watershed
The projects in this report are planning exercises based upon the simple thesis, “If you want this specific value in 50 years (be it swimming or water quality or grizzly bears),... -
Kitwanga Sockeye Recovery Plan Backgrounder
Kitwanga sockeye abundance has been in decline for the last five decades. Constraints to sockeye production are not well understood; it is thought they stem from a combination... -
Kitimat to Summit Lake Natural Gas Pipeline Looping Project: Conceptual...
Construction of the Kitimat to Summit Lake Natural Gas Pipeline Looping Project (the KSL Project) will enable delivery of natural gas from the Kitimat Liquefied Natural Gas... -
Kitimat - Summit Lake Pipeline Looping Project: Assessment Report
The purpose of this Assessment Report is to: describe the Project; summarize the process for the review of the Application; report on the adequacy of the Proponent’s... -
Kitimat - Summit Lake (KSL) Pipeline Looping Project: Project Description
This project description has been prepared for submission to the B.C. Environmental Assessment Office (EAO) in accordance with the requirements of the B.C. Environmental... -
Khyex-Tyee: Foreshore Habitat Re-construction Works
This report documents the foreshore habitat compensation works constructed by the Ministry of Transportation and Highways as part of the Highway 16 reconstruction project,... -
Implementing a Freshwater Salmon Habitat Monitoring Program in the Skeena Watershed
This project develops a framework for implementing a collaborative freshwater salmon habitat-monitoring program in the Skeena watershed. Its purpose is to help catalyze federal... -
Grassy Point LNG-Dome Environmental Assessments
Environmental assessments, risk analysis, and proposals for the development of a LNG terminal facilities at Grassy Point. -
Fisheries Assessment of Proposed Rip Rap Sites from Km17 to Km25 Morice River 1998
Slope failures along this section have led to a number of proposed remedial works, including rip rap placement at sites identified by the Ministry of Environment, Lands and... -
Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed
This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose...