Copper River Watershed Restoration Program: Site 9 Berm Removal
Site 9 is a 300 m long groundwater channel that was excavated in 1998 within a flood channel to the Copper River, adjacent to 3 km along the Copper Forest Service Road. This... -
Copper River Watershed Restoration Program: 3 km off-channel construction
One project aim was the improvement of fish habitat. The site is located adjacent to the Copper River forest services road, between km 2 and 3, approximately 10 km east of... -
Copper River Watershed Restoration Program: Debris Catcher Construction
Goals of the project included the improvement of fish habitat and educational purposes such as showing debris catchers as alternatives to traditional riprap bank protection for... -
Beaver Dam Mitigation and Nuisance Beaver Control
In 2023, the Gitanyow Fisheries Authority (GFA) was contracted by the BC Ministry of Forests to manage beaver dam mitigation and control in the Kitwanga and Nass watersheds. The... -
Killutsal Creek Rearing Pond Enhancement
Lakelse lake is a prized recreational area both locally and regionally. Many small and large creeks enter the river along its 14-km length and fish values in these creeks are... -
Zymoetz River Culvert Replacement and Outlet Channel (Site 77)
This project encompassed a culvert replacement to improve fish passage. Overwintering habitat by juvenile coho was isolated from the river by two perched culverts in the road.... -
Maxan Watershed Stream Habitat Restoration Works 1998/99
This report included Habitat Restoration Prescriptions for 12 sites on the Bulkley River, 2 sites on Foxy Creek, and 1 site on lower Maxan Creek. -
Maxan Watershed Stream Habitat Restoration and Enhancement Level 2 Design...
AGRA Earth & Environmental Limited (AEE) was retained by Dz'ilh K'Az Kwa Development Corporation (DKK) to design stream habitat restoration and enhancement measures in the... -
Fish and Fish Habitat Assessment of Maxan Creek Watershed, British Columbia
This report includes the fish and fish habitat assessment from the 1997 Level 2 assessment field survey. -
1st Avenue Culvert Replacements Lakelse Lake
The project focused on the replacement of eleven culverts along 1st Avenue at Lakelse Lake to improve fish passage. -
Bulkley River Bank Stabilization and Riparian Rehabilitation - Telkwa
The project was conducted on a privately owned site (Wittwer Ranch) around 4km upstream from Telkwa, northern BC. The goal of the Bulkley River Bank Stabilization and Riparian... -
CN Trestle Bridge Channel Diversion and Revegetation
A failing slope was discovered below CN's Trestle Bridge at 8.8 mile on the CN Kitimat Subdivision, located approx. 10 km south of Terrace, BC. The unnamed creek (referred to as... -
Richfield Creek Riparian Exclusion Fencing and Restoration
Richfield Creek was included in a larger riparian restoration initiative in 2021 through the Morice Water Monitoring Trust (see dataset: Upper Bulkley Riparian Restoration). The... -
Kumealon Creek Instream Construction
Two instream rehabilitation projects were implemented in Kumealon Creek, located 56 km south of Prince Rupert. The site is only accessible by boat or air. The creek has high... -
Lakelse Lake Sockeye Rehabilitation Program: Scully Creek Off-channel...
This report discusses the Scully Creek Off-channel Habitat and Flow Augmentation Project, which was initiated to improve sockeye spawning conditions that have been negatively... -
Waterfall Creek Enhancement Project 2000
A restoration/rehabilitation plan was developed that recommended and initiated measures to address community concerns by supplying survey and design for rehabilitation work,... -
Toboggan Creek Stream Rehabilitation and Silvern Lakes Road Deactivation
The objectives of this project are to re-establish and maintain the original stream channel, protect fish habitat, maintain fish passage and maintain 4wheel drive recreational... -
Nilkitkwa River Fish Passage Restoration
Assessment found that a pre-code fish crossing on an unnamed stream in the Nilkitkwa river watershed acted as a partial barrier to juvenile fish passage upstream due to high... -
Fulton River Watershed Fish Passage Restoration
A series of three restoration projects on the Fulton river (sites 8 & 13) and Harold Price creek (site 19) focused on amending pre-code stream crossings on forestry land to...