Biophysical, Socio-Economic, and Regional Data and Information (BERDI)
BERDI – a data bank for Biophysical, (Socio)Economic, and Regional Data and Information (pronounced “birdie”) - was created to make data collected by the Canada Energy Regulator... -
Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field... -
Impacts of LNG Development to Salmon Habitat on Lelu Island and Flora Bank
This report outlines the unaddressed issues that remain after the mitigation proposal presented by Petronas for a suspension bridge over Flora Bank. -
Zymoetz and Clore River Steelhead Trout: A Report on the 1978 and 1979 Sport...
This paper presents data collected during a creel census conducted in the years 1978 and 1979, and includes information on angler harvest and success, and life histories of... -
Wild Salmon Policy Indicator Analysis for the Kispiox TSA
Wild Salmon Policy indicators including road density, stream crossing density, riparian disturbance, and anthropogenic total land cover alternation (TLCA) were calculated for... -
Wet'suwet'en Title & Rights and Coastal GasLink
The Office of the Wet'suwet'en (OW) presents this submission to British Columbia Environmental Assessment Agency (BC EAO). This submission is a component of the Wet'suwet'en... -
Wet'suwet'en Submission to the Canadian Environmental Assessment Agency -...
This submission from the Office of the Wet'suwet'en (OW) to the Canadian Environmental Assessment Agency (CEAA) is a response to the CEAA report regarding the proposed Pacific... -
Wet'suwet'en Rights and Title and Enbridge's Northern Gateway Pipelines Project
The Office of the Wet'suwet'en (OW) presents this submission to the Northern Gateway Joint Review Panel. This submission is a component of the Wet'suwet'en response in respect... -
Westcoast Energy Inc Fireweed Offload Pipeline Project: Fisheries Habitat Assessment
This pre-impact habitat assessment was conducted on June 30, 1994 to identify and evaluate fish habitat along the proposed route associated with this project. -
Westcoast Connector Gas Transmission Project: Conceptual Freshwater Fish...
This freshwater CFHOP outlines the strategy and framework for development of the Final Fish Habitat Offsetting Plan (FHOP). A marine CFHOP companion document has also been... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the... -
TANTALIS - Crown Land Rights-of-way
This dataset contains the spatial representation (polygon) of active and applied for Statutory Rights-of-way. Statutory rights-of-way are registerable in a Land Titles office,... -
Summary of Construction Monitoring at PNG's Maxan Creek Crossing
This is a short report explaining the repair process of an exposed pipeline. -
Prince Rupert Marine Risk Assessment
This study provides Prince Rupert Port Authority (PRPA) with an assessment of the risks due to future operations of LNG and oil tankers in the Prince Rupert gateway, to compare... -
Potential Effects of an Oil Pipeline Rupture on Reach 2 of Morice River: A...
This submission focuses on a portion of the pipeline route that is located adjacent to Morice River, 70 km south of Smithers. It examines the implications of a pipeline rupture... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The... -
Pacific Trail Pipelines Project: Application to Amend Environmental...
This environmental assessment, like the effects assessment contained in the original 2007 EAC Application, is a sustainability-based environmental assessment that considers the... -
Pacific Trail Pipelines Project: Application No.4 to Amend Environmental...
This environmental effects assessment, like the effects assessment provided in the 2007 EAC Application, is a sustainability-based environmental assessment that considers five... -
Pacific Trail Pipelines Application Volume II: Baseline Studies
These baseline studies cover the following topics with regards to the impacts of the Pacific Trail Pipeline: acid rock drainage and metal leaching, acoustic environment, air...