Watershed Stewardship Decision Support Tool for Babine River and Babine Lake
Watershed Management Areas (WMAs) at multiple Watershed Management Levels (WMLs) for the Babine River and Babine Lake Watershed Atlas Groups. Attributes for both atlas groups... -
Kispiox River Watershed Stewardship Decision Support Tool
Results of the 2023 Equivalent Clearcut Area (ECA) analysis at six Watershed Management Levels (WMLs) for the Kispiox River Watershed with respect to Peak-Flow-Sensitivity (PFS)... -
Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field... -
Northwest Cumulative Effects Case Study
The Northwest pilot has investigated a range of cumulative effect related topics as well as developed methods to assess impacts of industrial development on a selection of... -
Northwest Water Tool Report Kathlyn Lake
A report with details on the Kathlyn Lake Watershed. Includes information on the hydrology, risk management levels and measures, existing water licenses, land cover, topography... -
Level I Detailed Field Assessment of Aquatic and Riparian Habitat for...
The Watershed Restoration Program of British Columbia is a program whereby watersheds that have been damaged by past logging practices undergo restoration. The program involves... -
Environmental and Socio-Economic Effects Report
This report is part of BC Hydro's transmission line from Terrace to Kitimat planning process to identify potential Project effects and proposed mitigation for biophysical or... -
Canadian Technical Report of Fisheries and Aquatic Sciences
Technical reports contain scientific and technical information that contributes to existing knowledge but which is not normally appropriate for primary literature. Technical... -
BC's Old Growth Forest: A Last Stand for Biodiversity
The report includes a series of detailed recommendations to prevent the loss of the last of the very rare and highly important productive old forest, and to manage the remainder... -
Wild Salmon Policy Indicator Analysis for the Kispiox TSA
Wild Salmon Policy indicators including road density, stream crossing density, riparian disturbance, and anthropogenic total land cover alternation (TLCA) were calculated for... -
Wet'suwet'en Submission to the Canadian Environmental Assessment Agency -...
This submission from the Office of the Wet'suwet'en (OW) to the Canadian Environmental Assessment Agency (CEAA) is a response to the CEAA report regarding the proposed Pacific... -
Wet'suwet'en Rights and Title and Enbridge's Northern Gateway Pipelines Project
The Office of the Wet'suwet'en (OW) presents this submission to the Northern Gateway Joint Review Panel. This submission is a component of the Wet'suwet'en response in respect... -
Watershed Status Evaluation: An Assessment of 71 Watersheds Meeting BC's...
This pilot project used the WSE Tier I GIS-based methods described in Porter et al. (2013) to assess the watershed indicator “risk” status of 71 watersheds across most of... -
Value of the Fisheries Resources in the Bulkley River System
The purpose of this report is to provide an indication of the net economic value of the fisheries stocks in the Bulkley river system. This is done by assessing current and... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed... -
Tenas Project Application Information Requirements 2022
The Application Information Requirements (AIR) specifies the information that Telkwa Coal Limited (the Proponent) is required to provide in their Application for an... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the... -
Skeena Cellulose Inc. Environmental Effects Monitoring (EEM) Cycle Three...
The purpose of this design document is to summarize and update mill process information and results from previous cycles and other studies, and to provide a rationale for the... -
Site Specific Risk Assessments of Two Former Copper Concentrate Shed Sites...
In summary, the risk assessments identified COCs in soil that may have potential to cause adverse effects, especially to soil invertebrates and plants, although this is...