Upper Bulkley River Steelhead Population Monitoring
The upper Bulkley River system, near Houston, was first assessed by the Fish Habitat Improvement Section in 1981. The initial assessment identified probably areas of importance... -
Toboggan Creek Coho Smolt Enumerations
The primary focus of the "Toboggan Creek Smolt Project" is to estimate the number of wild coho (0. kisutch) smolts leaving Toboggan Creek. Initiated in the spring of 1995, the... -
Skeena Environmental Effects Monitoring (EEM) Pre-Design Reference Document
This document provides a basis for the design phase of an environmental effects monitoring program (EEM) for Repap's pulp and paper mill, Skeena Cellulose Inc., located near... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information... -
Morrison Copper/Gold Project Assessment Report
This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health... -
Juvenile Coho Salmon and Steelhead Assessment of Lower Toboggan Creek,...
Juvenile sampling and habitat assessment was conducted in the lower three kilometers of Toboggan Creek from September to November, 1998. The lower two kilometers of the stream... -
Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed
This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose... -
Fish Monitoring Studies in Buck, Foxy and Crow Creeks and Goosly Lake
These reports present the results of the 2012 and 2017 fish monitoring programs conducted in the vicinity of Equity Mine near Houston BC. -
A Review of the Limnology and Sockeye Salmon Ecology of Babine Lake
This literature review summarizes the academic understanding of Babine Lake ecosystems during the 1980s, also providing information on the log storage and handling aspects at... -
1982 Investigations of Adult Coho Salmon in the Telkwa River
A study to provide more detailed information on the timing and distribution of adult coho salmon spawning in the Telkwa River Basin was conducted between September and December... -
Suskwa River Steelhead Trout: The 1977 Inventory, Creel Survey and Life...
The 1977 aspect of the Suskwa River project began in July and continued until freeze-up in November. Fish were sampled either with "Gees" traps or by angling. The inventory crew...