Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field surveys completed included sampling of fish species assemblages and habitat... -
Water Quality in the Toboggan Creek Watershed 1996-1998: Are Land Use Activit...
FO Habitat and Enhancement Branch initiated water quality monitoring in Toboggan Creek watershed in early 1996. Toboggan Creek is an important nursery stream for both wild and hatchery fish, primarily coho, pink, steelhead and Dolly Varden, with smaller... -
Vopak Pacific Canada Project Description
The purpose of the Project is to provide berthing and loading facilities for bulk liquid cargo that will be received via the existing rail loop on Ridley Island. Due to the shortage of market access, many products cannot reach international markets where... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an... -
Sustaining Lakelse Lake
A brief summary and visual results to natural resources and perks in Lakelse Lake. -
Skeena Environmental Effects Monitoring (EEM) Pre-Design Reference Document
This document provides a basis for the design phase of an environmental effects monitoring program (EEM) for Repap's pulp and paper mill, Skeena Cellulose Inc., located near Prince Rupert, British Columbia. The pre-design document is essentially a "State of... -
Sediment Source Mapping, Detailed Channel Assessment, and Reconnaissance Sedi...
Sediment source mapping, detailed channel assessment, and reconnaissance sediment budget for Williams Creek for the period 1949 to 2001. This study has two components: (1) sediment source mapping and reconnaissance sediment budgeting upslope of the alluvial... -
Review and Assessment of Water Quality in the Skeena River Watershed, British...
Historical water quality data presented for the Skeena River watershed are divided into nine subsequent sections, corresponding to the nine major watershed reaches. Each section is divided into 6 subsections: hydrology, land use history, water withdrawals,... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for Environmen...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The Application includes a description of the project, an outline of the Public and First... -
Pacific Trail Pipelines Application Volume II: Baseline Studies
These baseline studies cover the following topics with regards to the impacts of the Pacific Trail Pipeline: acid rock drainage and metal leaching, acoustic environment, air quality, archaeology, contaminated sites, fish and fish habitats, forestry,... -
Pacific Future Energy Refinery: Project Description
This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will be used and treated, and the potential impacts on the surrounding environment.... -
Natural Resource Stewardship Monitoring and Assessment Report for the Wet'suw...
Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data in this report has been arranged into the following categories: fish and water,... -
Kitimat - Summit Lake Pipeline Looping Project: Assessment Report
The purpose of this Assessment Report is to: describe the Project; summarize the process for the review of the Application; report on the adequacy of the Proponent’s distribution of information during the Application Review; report on whether the... -
Juvenile Coho Salmon and Steelhead Assessment of Lower Toboggan Creek, Septem...
Juvenile sampling and habitat assessment was conducted in the lower three kilometers of Toboggan Creek from September to November, 1998. The lower two kilometers of the stream is of lower habitat quality (higher gradient, greater velocity, little cover)... -
Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed
This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose of this report is to present background information and survey results for fish... -
Davidson Project: Application for Environmental Assessment Certificate
This underground mining project will be located in the Bulkley-Nechako Regional District and in the traditional territory of the Wet'suwet'en people. Included in this dataset are the executive summary and elements of chapter six which deal directly with the... -
Dahlie Creek Salmonid Overwintering and Water Quality Studies: Interim Report
This document contains a detailed fish habitat, riparian, and channel assessment of Dahlie Creek. Low channel complexity, removal of riparian vegetation, culvert obstructions to fish passage, sedimentation, altered flow regime, and channelization were some... -
Conceptual Fish Habitat Offsetting Plan: Proposed Aurora LNG Project
This Conceptual Fish Habitat Offsetting Plan marks the first step along the path to developing a Final Fish Habitat Offsetting Plan in support of an application for a Fisheries Act Authorization. More immediately, this plan is intended to support Aurora... -
Canada's Policy for Conservation of Wild Pacific Salmon: Stream, Lake, and Es...
This report documents the methodology used by the Department of Fisheries and Oceans (DFO) to identify potential Strategy 2 habitat indicators, metrics, and benchmarks (as well as possible sampling protocols). The proposed list of indicators presented in... -
Aquatic Stream Inventory: Operational Stream Inventory in the Morrison IRM Un...
The overall purpose of this project was to conduct fisheries inventory in operational areas identified by Houston Forest Products in the Morrison Integrated Resource Management Unit (IRM). The objectives were to conduct a literature review of inventory...