The Flooded Tailings Impoundment at the Equity Silver Mine
The Equity Silver Mine operated between 1980 and 1994, producing silver, gold, and copper from three open pits and a small underground operation. Mine components include a flooded tailings impoundment constructed from till and waste and quarried rock. This... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an... -
Telkwa Coal Project Appendix 6: Baseline Data, Surface Water, and Groundwater...
Samples were collected for the first time from a watercourse on the proposed project site on the north side of the Telkwa, and from sites on the Telkwa River and Goathorn Creek which were previously sampled in 1988. Samples were also collected from the... -
Telkwa Coal Project Appendix 12: Aquatic Resource Assessment 1985
Studies were undertaken during 1984 to evaluate aquatic resources in the Telkwa Project study area in west-central British Columbia. Stream periphyton, invertebrates, and fish populations were assessed in Goathorn and Tenas creeks and the lower Telkwa... -
Review of 2010 financial security at Equity Silver Mine
The Equity Silver Mine operated between 1980 and 1994, producing silver, gold, and copper from three open pits and a small underground operation. Future liability is important at the site due to the environmental risk and high cost of treating acid rock... -
Morrison Copper/Gold Application and Supporting Studies
This dataset contains elements of the Morrison Copper/Gold mine application which are relevant to salmon in the Skeena watershed. The document itself and its appendices constitute Pacific Booker Minerals' application for a certificate under the British... -
Fish Monitoring Studies in Buck, Foxy and Crow Creeks and Goosly Lake
These reports present the results of the 2012 and 2017 fish monitoring programs conducted in the vicinity of Equity Mine near Houston BC. -
Davidson Project: Application for Environmental Assessment Certificate
This underground mining project will be located in the Bulkley-Nechako Regional District and in the traditional territory of the Wet'suwet'en people. Included in this dataset are the executive summary and elements of chapter six which deal directly with the... -
Comments from Skeena Fisheries Commission Re: Pacific Booker Minerals' Review...
This report from the Skeena Fisheries Commission addresses the shortfalls in the Pacific Booker Minerals' Review Response Report from a fisheries perspective. -
Assessment of Benthic Invertebrate and Juvenile Fish Populations in Foxy and ...
Field studies assessing fish and benthic invertebrate populations in Foxy Creek, a small stream located in north central British Columbia near Houston, were undertaken in late August and September 1984. As well, benthic invertebrate populations were... -
A Preliminary Evaluation of the Environmental Impact of Mining, Community Dev...
An ecological study to assess the impact of environmental changes on the Babine sockeye production is currently being conducted under the auspices of the Babine Watershed Change Program. Specifically the Environmental Quality Unit of the Northern Operations... -
2012 Sustainability Report Closed Sites in Honduras, Mexico, the United State...
The focus of this report is on Goldcorp’s one closed site in Honduras (San Martin), one closed site in Mexico (Nukay in Guerrero), four closed sites in the United States (Dee and Daisy in Nevada, Rand in California, and Golden Reward in South Dakota) and... -
The Potential Effects of Cadmium and Other Mixed Metal Mining Effluents on Fi...
This review is a qualitative assessment of existing data and a review of relevant primary literature. The objective of this review is to assess the potential effects of elements released from the Morrison Copper/Gold Project on fish assemblages in Morrison... -
Telkwa Coal Project Appendix 2: ARD Potential and Management 1994
This report follows previous studies in 1985 on the coal deposits near Goathorn Creek, and in 1990 and 1991 on the coal deposits north of the Telkwa River. This report discusses all relevant evidence on the potential for acid generation, provides a... -
Environmental Impact Information of the Proposed Equity Mining Capital Ltd. D...
During 1974, Environment Canada undertook an additional study of the watershed adjacent to Equity Mining Capital Ltd.'s proposed development near Goosly Lake to supplement water quality baselines established in 1973. Chemistry analysis and 96 hour LC50... -
Davidson Project: Predicted Groundwater and Surface Water Chemistry Before, D...
This report illustrates and discusses the temporal trends in groundwater and surface water chemistry before, during, and after mining. It is based on empirical and predicted geochemistry and on the latest groundwater modelling using the MODFLOW model.