-
Monitoring Land Use Planning to Maintain Grizzly Bears Project 2009-3
This report aims to support monitoring for the implementation and effectiveness of land use planning for achieving management and conservation goals to maintain grizzly bears... -
Mid-Bulkley Overview Fish and Fish Habitat Assessment for Watershed Restoration
An overview fish and fish habitat assessment in the sub-basins of the Mid-Bulkley Watershed that: determines what fish species are at risk to the impacts of poor land-use... -
Mid-Bulkley Detailed Fish Habitat/Riparian/Channel Assessment for Watershed...
The Fish Habitat and Assessment Procedure (FHAP) is a means of assessing watersheds with a history of anthropogenic activity for impacts to fish and fish habitats using a set of... -
Marine Sediment and Water Quality Technical Data Report: Proposed Aurora LNG Project
To facilitate safe manoeuvring and berthing of vessels, capital dredging of marine sediment and rock will be required at two berth areas, located south of Frederick Point, and... -
Management Direction Statement for Kitson Island Marine Provincial Park
Management direction statements provide strategic management direction for protected areas that do not have an approved management plan. A portion of this park is subject to the... -
Lower Skeena Fish Passage: Closed Bottom Structure Assessments 2009
This project included the planning, data collection and analysis phases of closed bottom structure assessments for the purpose of identifying fish passage barriers in need of... -
Literature Review and Data Summary of Studies Related to Bell Mine, Babine Lake
This report summarizes available information on selected chemical and physical parameters of Babine Lake. The information has been reviewed in order to understand long term... -
Letter from Canadian Environmental Assessment Agency Fisheries for the...
The Canadian Environmental Assessment Agency (the Agency) is writing to inform Fisheries and Oceans Canada that in performing the duties and functions of the responsible... -
Landsat 7 Composite Tiled Image (Years 2000 to 2002)
A Landsat 7 composite image of the Skeena Watershed and surrounding area years 2000 - 2002. The composite image is tiled into four images - NW, NE, SW, and SE. The image is... -
Landsat 7 Composite Image of Skeena Watershed (2000-2002)
Landsat 7 Composite Image Cut to the Skeena Watershed Boundary. Capture dates 2000 to 2002. Projection is EPSG 3005. -
Land Use Designation Maps for Babine River Watershed
A series of maps representing various land use plan designations. -
Lakelse River Watershed - Review of Existing Information
This report reviews existing water, fisheries, and land-use related information for the Lakelse River watershed, considered for Fisheries Sensitive Watershed designation. This... -
Lakelse Literature Database
Environmental literature database for Lakelse Lake surrounding fish habitat and water quality. -
Lakelse Lake Draft Management Plan
The lake management planning process devises methods “to preserve and protect the quality and health of the Lakelse watershed”. This management plan marks the end of the first... -
Lakelse Lake Development Capacity
This report shows the results from various analyses such as Boat Limit Method, Shoreline Development Method, Chlorophyll-a Limiting Method, Morpheodaphic and Other Parameters... -
Lakelse 2060: A 50 Year Vision for the Lakelse Watershed
The projects in this report are planning exercises based upon the simple thesis, “If you want this specific value in 50 years (be it swimming or water quality or grizzly bears),... -
Kitsumkalum Traditional Use Study Interim Report for Pacific Northwest LNG/Petronas
This interim report summarizes the written literature on the Kitsumkalum First Nation in regards to their traditional land use practices within their traditional territory.... -
Kitimat to Summit Lake Natural Gas Pipeline Looping Project: Conceptual...
Construction of the Kitimat to Summit Lake Natural Gas Pipeline Looping Project (the KSL Project) will enable delivery of natural gas from the Kitimat Liquefied Natural Gas... -
Kitimat - Summit Lake Pipeline Looping Project: Assessment Report
The purpose of this Assessment Report is to: describe the Project; summarize the process for the review of the Application; report on the adequacy of the Proponent’s... -
Kitimat - Summit Lake (KSL) Pipeline Looping Project: Project Description
This project description has been prepared for submission to the B.C. Environmental Assessment Office (EAO) in accordance with the requirements of the B.C. Environmental...
