  • BWMT Project Reports

    This dataset contains eighteen reports initiated by the Babine Watershed Monitoring Trust between 2003 and 2013.
  • Technical Data Reports for Enbridge Northern Gateway Project

    Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field surveys completed included sampling of fish species assemblages and habitat...
  • DFO Area 4 Annual Reports 1950 - 1972

    DFO Area 4 Annual Narrative Reports from 1950 to 1972. Reports include comments on spawning summaries (coho, sockeye, pink and chinook), commercial fisheries, sport fisheries, Indian Food fisheries, water levels, herring, pollution (chemical spills),...
  • DFO Area 4 Reports 1973 - 1984

    DFO Area 4 Annual Narrative Reports from 1973 to 1984. Reports include comments on spawning summaries (coho, sockeye, pink and chinook), commercial fisheries, sport fisheries, Indian Food fisheries, water levels, herring, pollution (chemical spills),...
  • Conserving Lakelse Fish and their Habitat

    Lakelse Watershed backgrounder - This backgrounder has been updated for the use of the Lakelse Lake Sockeye Recovery Plan (LLSRP) planning table. It briefly presents at a watershed scale a biophysical profile, a description of the fisheries resource, and...
  • Vopak Pacific Canada Project Description

    The purpose of the Project is to provide berthing and loading facilities for bulk liquid cargo that will be received via the existing rail loop on Ridley Island. Due to the shortage of market access, many products cannot reach international markets where...
  • Tenas Project: Project Description

    Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in...
  • Telkwa Coal Project: Application for a Project Approval Certificate

    The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an...
  • Sustaining Lakelse Lake

    A brief summary and visual results to natural resources and perks in Lakelse Lake.
  • Skeena Environmental Effects Monitoring (EEM) Pre-Design Reference Document

    This document provides a basis for the design phase of an environmental effects monitoring program (EEM) for Repap's pulp and paper mill, Skeena Cellulose Inc., located near Prince Rupert, British Columbia. The pre-design document is essentially a "State of...
  • Pacific Trail Pipelines Project: Volume 1 Report - Application for Environmen...

    This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The Application includes a description of the project, an outline of the Public and First...
  • Pacific Trail Pipelines Application Volume II: Baseline Studies

    These baseline studies cover the following topics with regards to the impacts of the Pacific Trail Pipeline: acid rock drainage and metal leaching, acoustic environment, air quality, archaeology, contaminated sites, fish and fish habitats, forestry,...
  • Pacific Future Energy Refinery: Project Description

    This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will be used and treated, and the potential impacts on the surrounding environment....
  • Northwest Transmission Line: Bell-Irving Route Study

    Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the...
  • Natural Resource Stewardship Monitoring and Assessment Report for the Wet'suw...

    Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data in this report has been arranged into the following categories: fish and water,...
  • Morrison Copper/Gold Project 3rd Party Review Response Report

    This report presents the response to the 3rd Party Review of the Environmental Assessment for the Morrison Copper/Gold Project. The 3rd Party Review was requested by the Environmental Assessment Office and was mainly directed towards the hydrogeology, water...
  • Morrison Copper/Gold Application and Supporting Studies

    This dataset contains elements of the Morrison Copper/Gold mine application which are relevant to salmon in the Skeena watershed. The document itself and its appendices constitute Pacific Booker Minerals' application for a certificate under the British...
  • Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed

    This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose of this report is to present background information and survey results for fish...
  • An Assessment of the Effects on the Morice and Bulkley River Systems of a Pul...

    This report assesses the economic and biological consequences of further development at Houston, B.C. The first part of this paper identifies the geographic and biological aspects of the Bulkley River system and evaluates, in dollar terms, the commercial,...
  • A Review of the Effects Assessment for the Morrison Copper/Gold Project

    An assessment of the effects of the mine development on water flow, water quality and fish and aquatic resources has been carried out by the Proponent as part of its application for an Environmental Assessment Certificate. During the course of the Project...