Water Quality in British Columbia Objectives Attainment
The setting of water quality objectives in priority basins in British Columbia began in 1982. By the end of 2002, the Ministry of Water, Land, and Air Protection had set water... -
Water Quality and Accumulation of Periphyton (attached algae) in the Bulkley...
In recent years, studies in the upper Bulkley River upstream of Houston have noted elevated levels of bacteria, nutrients and attached algae (periphyton). A 1992 fisheries study... -
Water Quality Sampling for the 2001 Spring Runoff in the Bulkley Valley
The objective of the sampling program was to gather information on the water quality of specific streams during the spring runoff period, and from that information, determine... -
Water Quality Assessment and Objectives for Toboggan Creek and Tributaries:...
The purpose of this report is to assess the water quality and aquatic ecosystem data gathered to date and to recommend water quality objectives specific to the Toboggan Creek... -
Water Management at Equity Silver Mines Ltd.
Predominantly all wastes, both tailing and blasted rock, contain pyrite and are classified acid generating. Acid generation occurs within waste rock fills around the property... -
Upper Skeena and Kispiox River Juvenile Steelhead Surveys 1999
In 1999, the Ministry of Environment, Lands, and Parks surveyed portions of the Upper Skeena River and Kispiox Rivers during September 1999 for juvenile steelhead and fry and... -
Upper Bulkley and Morice Water and Salmon Sustainability Views: Inventory of...
In the Upper Bulkley and Morice basins of the Skeena watershed, climate change and human induced stresses are contributing to the degradation of aquatic resources, including... -
Upper Bulkley Watershed Reconnaissance July 26, 2018
Photographs and field notes from July 26, 2018 Upper Bulkley River (UBR) Watershed reconnaissance conducted by Cindy Verbeek and Margaret Letkeman. Field descriptions include... -
Upper Bulkley River Survey 1956
In August, 1955, a survey party inspected the Bulkley river from the falls to Bulkley Lake and sections of Maxam Creek and its main tributary, Foxy creek. Information on water... -
Upper Bulkley Floodplain Habitat: Modifications, Physical Barriers, and...
The Bulkley River upstream of the Morice River has some of the most intense public and private land use in the Skeena watershed. The purpose of this assessment was to document... -
Tyhee Lake Monitoring Results
A weblink to the Tyhee Lake sampling history and monitoring results on the BC Lake Monitoring Network. -
The Skeena River Estuary Status of Environmental Knowledge to 1975: Report...
This report compiles and summarizes knowledge on the Skeena River Estuary, providing useful background information for those concerned with environmental impacts of these and... -
The Salinity Intrusion of the Skeena River Observations of Salinities,...
Observations of salinities, temperatures and currents are presented in the form of vertical profiles at stations in the lower reaches of the Skeena River and in the approaches... -
The Oceanography of Chatham Sound, British Columbia
This paper is concerned with a detailed analysis of the data obtained during the 1948 oceanographic survey of Chatham Sound that was to determine whether there was any obvious... -
Telkwa Coal Project Appendix 8: Geotechnical and Hydrogeological...
Piteau Engineering Ltd. (PEL) was retained by Manalta Coal Ltd. (Manalta) to conduct a series of geotechnical and hydrogeological investigations in support of the proposed... -
Telkwa Coal Project Appendix 6: Baseline Data, Surface Water, and Groundwater 1994
Samples were collected for the first time from a watercourse on the proposed project site on the north side of the Telkwa, and from sites on the Telkwa River and Goathorn Creek... -
Skeena Environmental Effects Monitoring (EEM) Pre-Design Reference Document
This document provides a basis for the design phase of an environmental effects monitoring program (EEM) for Repap's pulp and paper mill, Skeena Cellulose Inc., located near... -
Skeena Cellulose Inc. Environmental Effects Monitoring (EEM) Cycle Three...
The purpose of this design document is to summarize and update mill process information and results from previous cycles and other studies, and to provide a rationale for the... -
Site-Specific Water Quality Guidelines for Skeena River at Usk for the...
Site-specific water quality guidelines for the Skeena River at Usk for the purpose of national reporting (May 2005). This document is one in a series that presents ambient site-... -
Seymour Lake: 1984 Data Summary and Recommendation
The 1984 sampling program for Seymour Lake was designed to provide nutrient loading data for the lake such that a management prescription for the lake and watershed management...