-
Level I Detailed Field Assessment of Aquatic and Riparian Habitat for Coldwater Creek in the Lakelse River Watershed
The Watershed Restoration Program of British Columbia is a program whereby watersheds that have been damaged by past logging practices undergo restoration. The program involves... -
Lakelse 2060: A 50 Year Vision for the Lakelse Watershed
The projects in this report are planning exercises based upon the simple thesis, “If you want this specific value in 50 years (be it swimming or water quality or grizzly bears),... -
Northwest Cumulative Effects Case Study
The Northwest pilot has investigated a range of cumulative effect related topics as well as developed methods to assess impacts of industrial development on a selection of... -
Lakelse River Watershed - Review of Existing Information
This report reviews existing water, fisheries, and land-use related information for the Lakelse River watershed, considered for Fisheries Sensitive Watershed designation. This... -
Sustaining Lakelse Lake
A brief summary and visual results to natural resources and perks in Lakelse Lake. -
Lakelse Lake Development Capacity
This report shows the results from various analyses such as Boat Limit Method, Shoreline Development Method, Chlorophyll-a Limiting Method, Morpheodaphic and Other Parameters... -
Steelhead Stock Assessment, 1983
Management prescriptions for specific waters have been identified. In most situations, these have or will be incorporated into the production program. The immediate future of... -
Skeena Region Fisheries Management Statement
The purpose of this regional planning statement is to provide long term direction for fisheries management in the Skeena region. This is accomplished through analysis of fish... -
Skeena Salmon: Lake Sockeye Conservation Unit Snapshot: Lakelse
This habitat report card was developed by the Pacific Salmon Foundation with technical support from ESSA Technologies. This project summarizes pressures on habitat used by... -
Implementing a Freshwater Salmon Habitat Monitoring Program in the Skeena Watershed
This project develops a framework for implementing a collaborative freshwater salmon habitat-monitoring program in the Skeena watershed. Its purpose is to help catalyze federal... -
Lakelse Lake Draft Management Plan
The lake management planning process devises methods “to preserve and protect the quality and health of the Lakelse watershed”. This management plan marks the end of the first... -
Killutsal Creek Rearing Pond Enhancement
The Lakelse is a prized recreational area both locally and regionally. Many small and large creeks enter the river along its 14-km length and fish values in these creeks are... -
Conserving Lakelse Fish and their Habitat
Lakelse Watershed backgrounder - This backgrounder has been updated for the use of the Lakelse Lake Sockeye Recovery Plan (LLSRP) planning table. It briefly presents at a... -
Zymoetz River Steelhead Trout: A Progress Report on the Zymoetz River Enhancement Program; Specifically the Diversion of Serb Creek
Steelhead trout are angled from the Zymoetz River, (locally known as the "Copper") near the City of Terrace on the west coast of British Columbia. The "Copper" was labeled as an... -
Zymoetz and Clore River Steelhead Trout: A Report on the 1978 and 1979 Sport Fishery and Some Aspects of their Life History
This paper presents data collected during a creel census conducted in the years 1978 and 1979, and includes information on angler harvest and success, and life histories of... -
Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field... -
Project Description Prince Rupert LNG
Prince Rupert LNG Limited (PRLNG) proposes to develop a Liquefied Natural Gas (LNG) facility on Ridley Island at the Port of Prince Rupert British Columbia (BC). The name of the... -
Environmental and Socio-Economic Effects Report
This report is part of BC Hydro's transmission line from Terrace to Kitimat planning process to identify potential Project effects and proposed mitigation for biophysical or... -
Environmental Impact Information of the Proposed Equity Mining Capital Ltd. Development near Houston, British Columbia
During 1974, Environment Canada undertook an additional study of the watershed adjacent to Equity Mining Capital Ltd.'s proposed development near Goosly Lake to supplement water... -
Pacific Northern Gas Looping Project: Project Description
This report summarizes the Pacific Northern Gas Looping Project by describing the project, areas of federal interest, the resource and material requirements, indigenous...