Skeena Cumulative Effects Assessment
This Skeena Cumulative Effects Assessment (SCEA) documents the analysis of the cumulative effects of individual and multiple physical, biological and chemical stressors... -
Salmon Science as Related to Proposed Development in the Skeena River Estuary
A collaborative research team of academic and First Nation scientists has been studying the Skeena River estuary ecosystem and its juvenile salmon. After 4 years, 100 boat days,... -
Rail Evacuation Maps
Railway evacuation maps for diesel, methanol, and propane referenced from the North American 2016 Emergency Response Guidebook -
Provincial Stream Crossing Information System (PSCIS) Remediation Sites
Points where a barrier to fish passage has been rectified or remediated. This is the third phase in the process and can only follow after (1) an assessment has been performed on... -
Provincial Stream Crossing Information System (PSCIS) Habitat Confirmation Sites
Points where an evaluation of the fish habitat up and downstream of a road crossing have been carried out. Phase 2 of 4 in the Fish Passage Workflow, Habitat Confirmations are... -
Provincial Stream Crossing Information System (PSCIS) Design Proposal Sites
Points where a fish passage assessment has been performed on a stream crossing structure and found to be a failure. Design points have been identified as a priority for... -
Project Description Prince Rupert LNG
Prince Rupert LNG Limited (PRLNG) proposes to develop a Liquefied Natural Gas (LNG) facility on Ridley Island at the Port of Prince Rupert British Columbia (BC). The name of the... -
Prince Rupert Marine Risk Assessment
This study provides Prince Rupert Port Authority (PRPA) with an assessment of the risks due to future operations of LNG and oil tankers in the Prince Rupert gateway, to compare... -
Operational Guide for Forest Road Wetland Crossings
The purpose of this guide is to provide forestry professionals and contractors with a general understanding of boreal wetlands, what to expect in terms of water movement between... -
Northwest Transmission Line EAO Inspection Records
Environmental Assessment Office inspection records for the Northwest Transmission Line project. The Environmental Assessment Office (Chris PARKS, Compliance Officer) completed... -
Letter from Canadian Environmental Assessment Agency Fisheries for the...
The Canadian Environmental Assessment Agency (the Agency) is writing to inform Fisheries and Oceans Canada that in performing the duties and functions of the responsible... -
Juvenile Salmonid Habitat Utilization in the Skeena River Estuary
This report examines the salmon habitat utilization of five species of Pacific salmon in the greater Skeena River estuary. In particular, interest is given in salmon habitat... -
Juvenile Salmon Usage of the Skeena River Estuary
This paper examines the geographic and temporal habitat utilization of juvenile anadromous salmon in the greater Skeena estuary in relation to the footprints of the proposed... -
Interim Assessment Protocol for Aquatic Ecosystems in British Columbia:...
The Aquatic Ecosystems assessment protocol currently describes the derivation of a core set of watershed indicators that can be calculated consistently across the province using... -
Fairview Terminal Phase II Expansion Project Comprehensive Study Report
The Prince Rupert Port Authority (PRPA) and Canadian National Railway Company (CN) are proposing the construction and operation of a wharf extension and expanded container and... -
Current and Proposed Mining, Energy, and Forestry Development in Northwest...
Map showing salmon habitat overlain with current and proposed infrastructure development in northwest BC. Infrastructure includes roads, forestry cutblocks, mines, transmission... -
Comments from Skeena Fisheries Commission Re: Pacific Booker Minerals'...
This report from the Skeena Fisheries Commission addresses the shortfalls in the Pacific Booker Minerals' Review Response Report from a fisheries perspective. -
Morrison Mine Re-Consideration and Comments of Pacific Booker Minerals on...
Comments from the Gitanyow Hereditary Chiefs on the Morrison copper/gold mine proposal.