-
Westcoast Energy Inc Fireweed Offload Pipeline Project: Fisheries Habitat Assessment
This pre-impact habitat assessment was conducted on June 30, 1994 to identify and evaluate fish habitat along the proposed route associated with this project. -
Watershed Status Evaluation: An Assessment of 71 Watersheds Meeting BC's...
This pilot project used the WSE Tier I GIS-based methods described in Porter et al. (2013) to assess the watershed indicator “risk” status of 71 watersheds across most of... -
Water Resources Service Pollution Control Branch - Lakelse Lake Water Quality Study
A comprehensive water quality limnology study in Lakelse Lake was completed by the Pollution Control Branch in 1973 - 74. The expressed purpose of this study, as developed by... -
Water Quality: Second Report on Chemical Sensitivity of BC Lakes to Acidic Inputs
This second summary document provides information (pH, alkalinity, calcium, and sensitivity rating) for about 760 lakes sampled between 1977 and 1986. This represents about 3.5%... -
Vopak Pacific Canada Project Description
The purpose of the Project is to provide berthing and loading facilities for bulk liquid cargo that will be received via the existing rail loop on Ridley Island. Due to the... -
Upper Skeena and Kispiox River Juvenile Steelhead Surveys 1999
In 1999, the Ministry of Environment, Lands, and Parks surveyed portions of the Upper Skeena River and Kispiox Rivers during September 1999 for juvenile steelhead and fry and... -
Upper Bulkley River and Toboggan Creek Overwintering Studies
An overwintering study was conducted over three winters (November 1998 to March 2001) in the Upper Bulkley and Toboggan Creek watersheds in north-central British Columbia. The... -
Upper Bulkley River Watershed Stream Surveys Summer 2007
A stream assessment study was conducted between July and August 2007 for several creeks in the Bulkley River watershed east of Houston, British Columbia. The study area... -
Upper Bulkley Floodplain Habitat: Modifications, Physical Barriers, and...
The Bulkley River upstream of the Morice River has some of the most intense public and private land use in the Skeena watershed. The purpose of this assessment was to document... -
Trout Creek/Kitseguecla Landscape Unit Plan
The Trout Creek Landscape Unit Plan (LUP) outlines the objectives and the strategies for the resource management of the Trout Creek and Toboggan watershed within the Bulkley... -
Toboggan Creek: a Report on the Results of Field Work Undertaken by the...
In 1978 the Bulkley Valley Steelhead Society obtained a $1,000 grant under the Salmonid Enhancement Program to construct and operate a counting fence and fish trap on Toboggan... -
Toboggan Creek Groundwater Channel Monitoring Project
Toboggan Creek is a tributary of the Bulkley River whose headwaters originate at the Hudson Bay glacier. Toboggan Creek has high fish value and is the indicator stream for Upper... -
Tier I Watershed-level fish values monitoring protocol
This report provides a protocol for Tier 1 watershed-level fish monitoring based on remote-sensed or broad-scale habitat inventory data available for all watersheds in regularly... -
The Distribution of Aquatic Vegetation in Lakelse Lake and the Partitioning...
This report was requested by the regional staff as part of a complete study on Lakelse Lake. There was a need to know the value of aquatic plants, for fish habitat, and their... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Telkwa Coal Project Appendix 12: Aquatic Resource Assessment 1985
Studies were undertaken during 1984 to evaluate aquatic resources in the Telkwa Project study area in west-central British Columbia. Stream periphyton, invertebrates, and fish... -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the... -
Survival Rates of Fry Released in the Headwaters of the Suskwa and Zymoetz Rivers
In order to assess the effectiveness of the Skeena fry stocking program, information of marked recaptures was examined. Sizeable returns of marked steelhead adults are not... -
Survey of Watson Lake and its Outlet Stream
Watson Lake was surveyed as a part of the Burns Lake-Houston small lakes project in which a total of 10 lakes were examined: Sunset, Gilmore, Swans, Lars, Old Man, McBrierie,...