-
Pacific Future Energy Refinery: Project Description
This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will... -
Pacific Fisheries Resource Conservation Council: Freshwater Habitat
This report discusses the attempts that British Columbians are making in the effort to protect and manage salmon habitat. They also describe the relevant legislation, policy,... -
Ongoing Legacy of Metal Mines on Babine Lake
An assessment of discharge regulation, aquatic monitoring, and aquatic impacts related to Bell and Granisle Mines. -
Old Woman Lake - Secondary Lake Inventory
The purpose of this survey is to conduct secondary lake inventories in the southern portions of the Morice and Lakes Forest Districts (Prince Rupert Forest Region). The lake was... -
Observations on Cutthroat Trout of the Lakelse River System, 1986, and...
Cutthroat trout contribute substantially to the Lakelse Lake-River sport fishery. This tagging study of cutthroat trout was undertaken during the May-November period of 1986 on... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information... -
Northwest Transmission Line Project: Assessment Report
This Assessment Report considers the proposed project's potential to cause significant adverse environmental, social, economic, heritage, and health effects. It identifies... -
Northwest Coast Traditional Salmon Fisheries System of Resource Utilization
This thesis presents evidence that traditional systems of salmon production were generally coincident with seasonal migrations of adult salmon returning from marine environments... -
Nisga'a Lands Freshwater Fish and Fish Habitat Technical Data Report for the...
This report summarizes field data collected in 2014 for fish and fish habitat along the proposed application corridors within Nisga’a Lands. Fish and fish habitat information... -
Natural Resource Stewardship Monitoring and Assessment Report for the...
Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data... -
Nadina Mountain Park Management Plan
The Nadina Mountain Park management plan establishes long-term strategic direction for Nadina Mountain Park. It sets out a vision for the future state of the park; addresses... -
Movements of Summer Run Steelhead Trout Tagged with Radio Transmitters in...
Radio telemetry was used to determine spawning locations of wild adult summer run steelhead in the Zymoetz River. Conventional angling methods were used to capture adult... -
Movements of Babine River Summer Run Steelhead Tagged with Surgically and...
The primary purpose of this investigation was to assess whether fish behavior differed between the two implementation times and methodologies. The secondary objectives were to... -
Movement of Radio Tagged Steelhead in the Morice River Determined by...
This project is part of the joint Department of Fisheries and Oceans (DFO) and BC Ministry of Environment program to reduce the incidental interception of steelhead bound for... -
Morrison Lake Hydroacoustic Surveys
The Skeena Fisheries Commission (SFC) conducted hydroacoustic surveys at Morrison Lake during the fall of 2011, 2012, and 2013 in order to determine the density and abundance of... -
Morrison Copper/Gold Project Fish Habitat Compensation Plan
Pacific Brooker Minerals is proposing to develop the Morrison Copper/Gold Project on the east side of Morrison Lake, north of Babine Lake. The project will require the... -
Morrison Copper/Gold Project Assessment Report
This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health... -
Morrison Copper/Gold Project 3rd Party Review Response Report
This report presents the response to the 3rd Party Review of the Environmental Assessment for the Morrison Copper/Gold Project. The 3rd Party Review was requested by the... -
Morrison Copper/Gold Mine Project: DFOs Comments on the Draft Terms of Reference
DFOs comments on the October 16th draft TOR for the Morrison Cu/Au Project of Pacific Booker Minerals Inc. -
Morrison Copper/Gold Application and Supporting Studies
This dataset contains elements of the Morrison Copper/Gold mine application which are relevant to salmon in the Skeena watershed. The document itself and its appendices...