Fisheries Assessment of Proposed Rip Rap Sites from Km17 to Km25 Morice River 1998
Slope failures along this section have led to a number of proposed remedial works, including rip rap placement at sites identified by the Ministry of Environment, Lands and... -
Upper Zymoetz (Copper River) WRP Overview Fish and Riparian Assessment
This report summarizes fish and fish habitat values within the Copper River watershed and describes impacts to both the fisheries resource and riparian habitats regulating from... -
Skeena Salmon: Lake Sockeye Conservation Unit Snapshot: Lakelse
This habitat report card was developed by the Pacific Salmon Foundation with technical support from ESSA Technologies. This project summarizes pressures on habitat used by... -
Zymoetz and Clore River Steelhead Trout: A Report on the 1978 and 1979 Sport...
This paper presents data collected during a creel census conducted in the years 1978 and 1979, and includes information on angler harvest and success, and life histories of... -
Wet'suwet'en Title & Rights and Coastal GasLink
The Office of the Wet'suwet'en (OW) presents this submission to British Columbia Environmental Assessment Agency (BC EAO). This submission is a component of the Wet'suwet'en... -
Water Quality in the Toboggan Creek Watershed 1996-1998: Are Land Use...
FO Habitat and Enhancement Branch initiated water quality monitoring in Toboggan Creek watershed in early 1996. Toboggan Creek is an important nursery stream for both wild and... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The... -
Pacific Trail Pipelines Project: Application to Amend Environmental...
This environmental assessment, like the effects assessment contained in the original 2007 EAC Application, is a sustainability-based environmental assessment that considers the... -
Pacific Trail Pipelines Project: Application No.4 to Amend Environmental...
This environmental effects assessment, like the effects assessment provided in the 2007 EAC Application, is a sustainability-based environmental assessment that considers five... -
Pacific Trail Pipelines Application Volume II: Baseline Studies
These baseline studies cover the following topics with regards to the impacts of the Pacific Trail Pipeline: acid rock drainage and metal leaching, acoustic environment, air... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information... -
Morrison Copper/Gold Project Fish Habitat Compensation Plan
Pacific Brooker Minerals is proposing to develop the Morrison Copper/Gold Project on the east side of Morrison Lake, north of Babine Lake. The project will require the... -
Morrison Copper/Gold Application and Supporting Studies
This dataset contains elements of the Morrison Copper/Gold mine application which are relevant to salmon in the Skeena watershed. The document itself and its appendices... -
Marine Sediment and Water Quality Technical Data Report: Proposed Aurora LNG Project
To facilitate safe manoeuvring and berthing of vessels, capital dredging of marine sediment and rock will be required at two berth areas, located south of Frederick Point, and... -
Letter from Canadian Environmental Assessment Agency Fisheries for the...
The Canadian Environmental Assessment Agency (the Agency) is writing to inform Fisheries and Oceans Canada that in performing the duties and functions of the responsible... -
Kitimat to Summit Lake Natural Gas Pipeline Looping Project: Conceptual...
Construction of the Kitimat to Summit Lake Natural Gas Pipeline Looping Project (the KSL Project) will enable delivery of natural gas from the Kitimat Liquefied Natural Gas... -
Hydrolic and Geomorphic Considerations for Silvicultural Investments on the...
Hydrologic and geomorphic considerations for silvicultural investments on the lower Skeena River floodplain. This report evaluates four inter-related components essential for... -
Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed
This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose... -
Davidson Project: Application for Environmental Assessment Certificate
This underground mining project will be located in the Bulkley-Nechako Regional District and in the traditional territory of the Wet'suwet'en people. Included in this dataset...