Analysis and Priority Identification of Existing Fish Passage Data: Bulkley R...
For this project, existing fish passage information in the Bulkley River watershed located near Smithers, British Columbia, was reviewed in order to prioritize and rank culverts... -
Annual Compendium of Aquatic Rehabilitation Projects for the Watershed Restor...
B.C.'s Watershed Restoration Program (WRP) was implemented under the Province's Forest Renewal Plan in mid-1994 in response to a historical lack of mechanisms for ensuring... -
Upper Zymoetz (Copper River) WRP Overview Fish and Riparian Assessment
This report summarizes fish and fish habitat values within the Copper River watershed and describes impacts to both the fisheries resource and riparian habitats regulating from... -
Upper Skeena and Kispiox River Juvenile Steelhead Surveys 1999
In 1999, the Ministry of Environment, Lands, and Parks surveyed portions of the Upper Skeena River and Kispiox Rivers during September 1999 for juvenile steelhead and fry and... -
Toboggan Creek Watershed Restoration Project
These reports present the information found during the Toboggan Creek Watershed Restoration Project. This project assessed the historical background of the watershed, including... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Stream Inventory: Fenton Creek and Adjacent Tributaries 1997
This survey provides an assessment of fish presence/absence in Fenton Creek and its adjacent tributaries. It identifies stream gradients and reasons for obstructed fish passage,... -
Stream Inventory Tagit Creek and Adjacent Tributaries 1997
The major emphasis of the study was to provide a broad-based aquatic inventory at an operational and landscape level to facilitate planning for forest development that minimizes... -
Results of the Kloiya River Resistivity Counter
The objective of this study was to quantify juvenile steelhead abundance and estimate values for habitat capacity thresholds. In 2005, the Ministry of Environment (MoE) began... -
Reconnaissance Level Fish and Fish Habitat Inventory for the Kispiox Forest D...
Forest Renewal BC is implementing fish and fish habitat inventories to provide information required for resource planning. Triton's goals were to describe fish distributions and... -
Reconnaissance Fish and Fish Habitat Inventory of the Middle Skeena River Tri...
This fish and fish habitat inventory provides information regarding fish species presence, distribution, and relative abundance, as well as stream reach biophysical data, for... -
Reconnaissance (1:20,000) Fish and Fish Habitat Stream Inventory Re-Sampling ...
The main objectives of the 1:20,000 fish and fish habitat reconnaissance level stream inventory project in lower Buck Creek watershed were: to review and summarize historical... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory Subdrainages in the...
The objective of this project was to conduct a Reconnaissance (1:20,000) Fish and Fish Habitat Inventory in several drainages in the Bulkley River watershed. This included... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for Environmen...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The... -
Pacific Fisheries Resource Conservation Council: Freshwater Habitat
This report discusses the attempts that British Columbians are making in the effort to protect and manage salmon habitat. They also describe the relevant legislation, policy,... -
Morrison Copper/Gold Project Fish Habitat Compensation Plan
Pacific Brooker Minerals is proposing to develop the Morrison Copper/Gold Project on the east side of Morrison Lake, north of Babine Lake. The project will require the... -
Morrison Copper/Gold Project Assessment Report
This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health... -
Mid-Bulkley Overview Fish and Fish Habitat Assessment for Watershed Restoration
An overview fish and fish habitat assessment in the sub-basins of the Mid-Bulkley Watershed that: determines what fish species are at risk to the impacts of poor land-use... -
Marine Fish and Fish Habitat Technical Data Report: Proposed Aurora LNG Project
This Technical Data Report (TDR) presents information on existing conditions for marine fish and fish habitats within local and regional assessment areas. The purpose of the TDR... -
Fisheries Background Studies Morrison Watershed 2004
This report summarizes background fisheries information available for the Morrison Watershed. It focuses on Morrison Creek, Morrison Lake, and its inlet tributaries, with the...