Reconnaissance Level Fish and Fish Habitat Inventories in the Bulkley T.S.A.
These reports summarize the reconnaissance level fish and fish habitat inventories for various locations along the Bulkley River. Sensitive habitats and barriers are discussed,... -
Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field... -
Wet'suwet'en Title & Rights and Coastal GasLink
The Office of the Wet'suwet'en (OW) presents this submission to British Columbia Environmental Assessment Agency (BC EAO). This submission is a component of the Wet'suwet'en... -
Wet'suwet'en Rights and Title and Enbridge's Northern Gateway Pipelines Project
The Office of the Wet'suwet'en (OW) presents this submission to the Northern Gateway Joint Review Panel. This submission is a component of the Wet'suwet'en response in respect... -
Water Quality in the Toboggan Creek Watershed 1996-1998: Are Land Use...
FO Habitat and Enhancement Branch initiated water quality monitoring in Toboggan Creek watershed in early 1996. Toboggan Creek is an important nursery stream for both wild and... -
Value of the Fisheries Resources in the Bulkley River System
The purpose of this report is to provide an indication of the net economic value of the fisheries stocks in the Bulkley river system. This is done by assessing current and... -
Upper Zymoetz (Copper River) WRP Overview Fish and Riparian Assessment
This report summarizes fish and fish habitat values within the Copper River watershed and describes impacts to both the fisheries resource and riparian habitats regulating from... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Skeena Bulkley RMP: Enhancing Environmental Values
The Skeena Bulkley RMP was originally developed in 1999 and has been refined and updated annually. This document is the third section of the overall Skeena Bulkley RMP, and... -
Results of the Kloiya River Resistivity Counter
The objective of this study was to quantify juvenile steelhead abundance and estimate values for habitat capacity thresholds. In 2005, the Ministry of Environment (MoE) began... -
Resource Development in the Upper Zymoetz River Catchment 1995
This report addresses issues concerning the Class I angling water designation of the Zymoetz River. Attributes associated with the Zymoetz River's Class I angling water... -
Reconnaissance Level Fish and Fish Habitat Inventory for the Kispiox Forest District
Forest Renewal BC is implementing fish and fish habitat inventories to provide information required for resource planning. Triton's goals were to describe fish distributions and... -
Reconnaissance Fish and Fish Habitat Inventory of the Middle Skeena River Tributaries
This fish and fish habitat inventory provides information regarding fish species presence, distribution, and relative abundance, as well as stream reach biophysical data, for... -
Reconnaissance (1:20,000) Fish and Fish Habitat Inventory Re-sampling of...
This report summarizes past fish inventory efforts and results in context with data collected during re-sampling to present a comprehensive picture of fish distribution in the... -
Preliminary Survey of Juvenile Salmonid Rearing Habitat Summer 1976: Upper...
A preliminary study of the juvenile salmonid populations of the Upper Kalum River and its tributaries was conducted during August 1976. The objectives of the study were: to... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The... -
Pacific Trail Pipelines Application Volume II: Baseline Studies
These baseline studies cover the following topics with regards to the impacts of the Pacific Trail Pipeline: acid rock drainage and metal leaching, acoustic environment, air... -
Pacific Future Energy Refinery: Project Description
This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information...