Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field... -
DFO Area 4 Annual Reports 1950 - 1972
DFO Area 4 Annual Narrative Reports from 1950 to 1972. Reports include comments on spawning summaries (coho, sockeye, pink and chinook), commercial fisheries, sport fisheries,... -
DFO Area 4 Annual Reports 1918 - 1949
Department of Fisheries and Oceans Area 4 Annual Reports from 1918 - 1949. Reports include comments on spawning summaries (coho, sockeye, pink and chinook), commercial... -
DFO Area 4 Reports 1973 - 1984
DFO Area 4 Annual Narrative Reports from 1973 to 1984. Reports include comments on spawning summaries (coho, sockeye, pink and chinook), commercial fisheries, sport fisheries,... -
Conserving Lakelse Fish and their Habitat
Lakelse Watershed backgrounder - This backgrounder has been updated for the use of the Lakelse Lake Sockeye Recovery Plan (LLSRP) planning table. It briefly presents at a... -
BWMT Project Reports
This dataset contains eighteen reports initiated by the Babine Watershed Monitoring Trust between 2003 and 2013. -
Vopak Pacific Canada Project Description
The purpose of the Project is to provide berthing and loading facilities for bulk liquid cargo that will be received via the existing rail loop on Ridley Island. Due to the... -
The Physical Limnology of Lakelse Lake, British Columbia
During the five years, 1944 to 1948, physical and chemical studies were conducted on Lakelse lake, B.C., as part of the programme of salmon research on the Skeena river.... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Sustaining Lakelse Lake
A brief summary and visual results to natural resources and perks in Lakelse Lake. -
Skeena River Estuary Assessment Project
This project assessed key pressures on salmon habitat in the Skeena River estuary. The authors used benchmarks to assess the status of salmon habitat indicators and identified... -
Skeena Environmental Effects Monitoring (EEM) Pre-Design Reference Document
This document provides a basis for the design phase of an environmental effects monitoring program (EEM) for Repap's pulp and paper mill, Skeena Cellulose Inc., located near... -
Results of the Kloiya River Resistivity Counter
The objective of this study was to quantify juvenile steelhead abundance and estimate values for habitat capacity thresholds. In 2005, the Ministry of Environment (MoE) began... -
Residual Impacts on water quality and sockeye salmon fry habitat: Twenty year...
The Morrison River enters Babine Lake from the northwest. Morrison and Tahlo Lakes are important sockeye (Oncorhynchus nerka) nursery lakes that collectively host the second... -
Reconnaissance Level Fish and Fish Habitat Inventory for the Kispiox Forest D...
Forest Renewal BC is implementing fish and fish habitat inventories to provide information required for resource planning. Triton's goals were to describe fish distributions and... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for Environmen...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The... -
Pacific Trail Pipelines Application Volume II: Baseline Studies
These baseline studies cover the following topics with regards to the impacts of the Pacific Trail Pipeline: acid rock drainage and metal leaching, acoustic environment, air... -
Pacific Future Energy Refinery: Project Description
This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information...