-
Telkwa Watershed: A Forest Hydrology Analysis
This study reviews physical watershed characteristics, historical stream flow, and climatic data relevant to the Telkwa watershed. A simple modelling exercise is done to show... -
Morice Watershed-Based Fish Sustainability Plan
The purpose of the Morice Watershed-based Fish Sustainability Plan is to sustain robust fish populations and fully functioning aquatic ecosystems in the Morice River watershed.... -
Conserving Lakelse Fish and their Habitat
Lakelse Watershed backgrounder - This backgrounder has been updated for the use of the Lakelse Lake Sockeye Recovery Plan (LLSRP) planning table (related to the Lakelse Lake... -
Analysis of Water Quality Monitoring in the Morice Water Management Area
The Morice Water Management Area (MWMA) was established in 2007 by the Morice Land and Resource Management Plan with the intent to protect the hydrological integrity, water... -
Morice River Watershed Morphometry, Glacier Inventory and Future Glacier Changes
Three reports are provided that aim to detail the dominant landscape and cryospheric determinants of water quality and quantity in the upper Morice River region from the... -
Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field... -
Davidson Project Meteorology and Hydrology Baseline Report 2006-2008
This meteorology and hydrology baseline report summarizes results from 2006, 2007, and 2008 from the Davidson meteorology station and for 6 hydrometric stations established for... -
Conserving Morice Watershed Fish Populations and their Habitat: Stage II...
This report addresses Stage II of the Watershed-based Fish Sustainability Planning process by developing the biophysical profile of the Morice Watershed. Stage II produced a... -
Watershed Assessment of the Kitseguekla Community Watershed
At the request of Skeena Cellulose Inc. Carnaby Division, a Watershed Assessment of the Kits Creek watershed was conducted by Freshwater Resources of Smithers, B.C. The... -
Water Temperature, River Discharge, and Adult Sockeye Salmon Migration...
Water temperature, river discharge, and adult sockeye salmon migration observations in the Babine watershed, 1946-2014. Historical meteorological and hydrological data were... -
Water Quality Objectives for Bulkley and Morice Rivers (1986)
This report includes an assessment of present water quality, a prediction of future water quality, recommended water uses that should be protected, and recommended monitoring to... -
Water Monitoring in British Columbia: Scanning the Data Landscape Public Report
The overall goal of this scan is to inform a shared vision for water monitoring and reporting in BC. This scan collected information on surface and groundwater quality and... -
Water Management at Equity Silver Mines Ltd.
Predominantly all wastes, both tailing and blasted rock, contain pyrite and are classified acid generating. Acid generation occurs within waste rock fills around the property... -
Upper Bulkley River Survey 1956
In August, 1955, a survey party inspected the Bulkley river from the falls to Bulkley Lake and sections of Maxam Creek and its main tributary, Foxy creek. Information on water... -
Upper Bulkley Floodplain Habitat: Modifications, Physical Barriers, and...
The Bulkley River upstream of the Morice River has some of the most intense public and private land use in the Skeena watershed. The purpose of this assessment was to document... -
Upper Bulkley Fish and Aquatic Review: Stream Flow, Surface Water Licenses...
Upper Bulkley fish and aquatic review: stream flow, surface water licenses and groundwater wells. The Upper Bulkley Fish and Aquatic Review Project produced a set of analyses... -
The Skeena River Estuary Status of Environmental Knowledge to 1975: Report...
This report compiles and summarizes knowledge on the Skeena River Estuary, providing useful background information for those concerned with environmental impacts of these and... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Telkwa Coal Project Appendix 8: Geotechnical and Hydrogeological...
Piteau Engineering Ltd. (PEL) was retained by Manalta Coal Ltd. (Manalta) to conduct a series of geotechnical and hydrogeological investigations in support of the proposed... -
Telkwa Coal Project Appendix 6: Baseline Data, Surface Water, and Groundwater 1994
Samples were collected for the first time from a watercourse on the proposed project site on the north side of the Telkwa, and from sites on the Telkwa River and Goathorn Creek...