Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field... -
Conserving Morice Watershed Fish Populations and their Habitat: Stage II...
This report addresses Stage II of the Watershed-based Fish Sustainability Planning process by developing the biophysical profile of the Morice Watershed. Stage II produced a... -
Conserving Lakelse Fish and their Habitat
Lakelse Watershed backgrounder - This backgrounder has been updated for the use of the Lakelse Lake Sockeye Recovery Plan (LLSRP) planning table. It briefly presents at a... -
The Skeena River Estuary Status of Environmental Knowledge to 1975: Report...
This report compiles and summarizes knowledge on the Skeena River Estuary, providing useful background information for those concerned with environmental impacts of these and... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Skeena-Nass Area Water Quality Assessment and Objectives: Technical Appendix
This report assess present water quality of the mainstem Bulkley and Morice Rivers, to predict future water quality, and to recommend water uses that should be protected, and to... -
Skeena Environmental Effects Monitoring (EEM) Pre-Design Reference Document
This document provides a basis for the design phase of an environmental effects monitoring program (EEM) for Repap's pulp and paper mill, Skeena Cellulose Inc., located near... -
Review of the Hydrology, Geomorphology, Ecology & Management of the Skeena...
Review of the hydrology, geomorphology, ecology and management of the Skeena River floodplain. This review of the natural and human history of the floodplain of the lower Skeena... -
Review and Assessment of Water Quality in the Skeena River Watershed,...
Historical water quality data presented for the Skeena River watershed are divided into nine subsequent sections, corresponding to the nine major watershed reaches. Each section... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information... -
Natural Resource Stewardship Monitoring and Assessment Report for the...
Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data... -
Morrison Copper/Gold Project 3rd Party Review Response Report
This report presents the response to the 3rd Party Review of the Environmental Assessment for the Morrison Copper/Gold Project. The 3rd Party Review was requested by the... -
Morrison Copper/Gold Application and Supporting Studies
This dataset contains elements of the Morrison Copper/Gold mine application which are relevant to salmon in the Skeena watershed. The document itself and its appendices... -
Morice Watershed-Based Fish Sustainability Plan: A Plan to Conserve and...
The purpose of the Morice Watershed-based Fish Sustainability Plan is to sustain robust fish populations and fully functioning aquatic ecosystems in the Morice River watershed.... -
Lakelse Lake Water Quality Assessment and Objectives
This study assesses the water quality of Lakelse Lake. A summary report and detailed technical appendix are included. Report published February 1986. -
Kitimat - Summit Lake Pipeline Looping Project: Assessment Report
The purpose of this Assessment Report is to: describe the Project; summarize the process for the review of the Application; report on the adequacy of the Proponent’s... -
Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed
This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose... -
Davidson Project: Application for Environmental Assessment Certificate
This underground mining project will be located in the Bulkley-Nechako Regional District and in the traditional territory of the Wet'suwet'en people. Included in this dataset... -
Consequences of Unregulated Release of Raw Acid Mine Drainage into the...
Approximately 800 000 m3 of acid mine drainage (AMD) is generated per year at the Equity Silver Mine southeast of Houston. This AMD would have devastating effects on the Bulkley...