-
Fish Passage Assessment of Kispiox Forestry Road Stream Crossing
The purpose of this report is to present background information and survey results for fish passage assessments conducted at Kispiox forestry road stream crossings. The Kispiox... -
Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field... -
Vopak Pacific Canada Project Description
The purpose of the Project is to provide berthing and loading facilities for bulk liquid cargo that will be received via the existing rail loop on Ridley Island. Due to the... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments... -
Results of the Kloiya River Resistivity Counter
The objective of this study was to quantify juvenile steelhead abundance and estimate values for habitat capacity thresholds. In 2005, the Ministry of Environment (MoE) began... -
Reconnaissance Level Fish and Fish Habitat Inventory for the Kispiox Forest District
Forest Renewal BC is implementing fish and fish habitat inventories to provide information required for resource planning. Triton's goals were to describe fish distributions and... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The... -
Pacific Trail Pipelines Application Volume II: Baseline Studies
These baseline studies cover the following topics with regards to the impacts of the Pacific Trail Pipeline: acid rock drainage and metal leaching, acoustic environment, air... -
Pacific Future Energy Refinery: Project Description
This project description for the Pacific Future Energy refinery presents the purpose of the project, its location, and its building procedures. It also discusses how water will... -
Natural Resource Stewardship Monitoring and Assessment Report for the...
Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data... -
Morrison Copper/Gold Project Fish Habitat Compensation Plan
Pacific Brooker Minerals is proposing to develop the Morrison Copper/Gold Project on the east side of Morrison Lake, north of Babine Lake. The project will require the... -
Morrison Copper/Gold Project Assessment Report
This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health... -
Morrison Copper/Gold Application and Supporting Studies
This dataset contains elements of the Morrison Copper/Gold mine application which are relevant to salmon in the Skeena watershed. The document itself and its appendices... -
Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed
This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose... -
Canada's Policy for Conservation of Wild Pacific Salmon: Stream, Lake, and...
This report documents the methodology used by the Department of Fisheries and Oceans (DFO) to identify potential Strategy 2 habitat indicators, metrics, and benchmarks (as well... -
Canada's Policy for Conservation of Wild Pacific Salmon
Links to sites related to the Fisheries and Oceans Canada Wild Pacific Salmon Policy -
Aquatic Stream Inventory: Operational Stream Inventory in the Morrison IRM Unit 1996
The overall purpose of this project was to conduct fisheries inventory in operational areas identified by Houston Forest Products in the Morrison Integrated Resource Management... -
A Review of the Effects Assessment for the Morrison Copper/Gold Project
An assessment of the effects of the mine development on water flow, water quality and fish and aquatic resources has been carried out by the Proponent as part of its application...