Environmental Management Plan Peacock Creek Km...
Profor was retained by the MFLNRORD to prepare an EMP in support of the replacement of a 2.3 m high by 4.0 m wide corrugated steel pipe (CSP) with a two lane bridge at Km 7.5 on the Morice FSR (Structure R5-147). The proposed new crossing structure consists of a permanent 24.384 m steel girder with concrete composite deck bridge. The bridge will be on driven steel piles.