-
Bulkley/Fulton Watershed Fish Passage Culvert Assessment Program
This study looks at barriers to fish crossings in the Bulkley-Fulton watershed, including forestry roads and poorly situated culverts. Funding was made available to restore fish... -
Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field... -
Vopak Pacific Canada Project Description
The purpose of the Project is to provide berthing and loading facilities for bulk liquid cargo that will be received via the existing rail loop on Ridley Island. Due to the... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed... -
Technical Data Report: Conceptual Freshwater Fish Habitat Compensation Plan...
The objectives of this plan are three-fold. First, the plan describes the methods that will be used to quantify the amount of compensatory fish habitat needed to offset the... -
Pacific Northern Gas Looping Project: Project Description
This report summarizes the Pacific Northern Gas Looping Project by describing the project, areas of federal interest, the resource and material requirements, indigenous... -
Landsat 8 Satellite Images from 2013-2017
Landsat 7 Satellite Images from 2013 - 2017. Data is provided by WRS path and row number. Data files follow the new USGS Landsat categories and are classified as Collection 1... -
Landsat 8 Composite Tiled Image (Years 2013 to 2017)
A composite image of the Skeena Watershed and surrounding area using Landsat 8 data from 2013 - 2017. The composite image is tiled into four images - NW, NE, SW, and SE. The... -
Landsat 8 Composite Image of Skeena Watershed (2013-2017)
Landsat 8 Composite Image Cut to the Skeena Watershed Boundary. Capture dates 2013 to 2017. Projection is EPSG 3005.