Wet'suwet'en Rights and Title and Enbridge's Northern Gateway Pipelines Project
The Office of the Wet'suwet'en (OW) presents this submission to the Northern Gateway Joint Review Panel. This submission is a component of the Wet'suwet'en response in respect of the proposed Northern Gateway project within Wet'suwet'en territory. The... -
Waterfall Creek Enhancement Project 2000
A restoration/rehabilitation plan was developed that recommended and initiated measures to address community concerns by supplying survey and design for rehabilitation work, while providing community involvement and focus through trail development and... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an... -
Skeena River Chinook Baseline Sampling
A large sampling program was undertaken in 2009 by the Skeena Fisheries Commission to improve the genetic baseline information on Skeena River Chinook. -
Population Structure of Lake-Type and River-Type Sockeye Salmon in Transbound...
The objective of the present study was to evaluate microsatellite genetic differentiation between lake-type and riverine populations within the same river drainage, among riverine populations in the same drainage, and among riverine populations in different... -
Habitat Improvement and Outplanting Possibilities - Upper Bulkley/ Morice Sys...
The NCD Habitat Unit, along with coho biologists from the Science Branch, conducted a juvenile coho sampling program on the Upper Bulkley/Morice River systems during the month of August from 1987 to 1990. This study furthers the understanding of coho... -
Distribution, Timing, and Numbers of Steelhead Returning to the Skeena Waters...
This report summarizes the data collected during the July to November 1995 period and describes the fate and timing information of steelhead movements to the end of November 1995. Fishwheels operated by the Kitselas Band Office were used to catch and apply... -
Canada's Policy for Conservation of Wild Pacific Salmon: Stream, Lake, and Es...
This report documents the methodology used by the Department of Fisheries and Oceans (DFO) to identify potential Strategy 2 habitat indicators, metrics, and benchmarks (as well as possible sampling protocols). The proposed list of indicators presented in... -
Biophysical Reconnaissance of the Morice River System, 1978-1980
A bio-manageability study of chinook and coho salmon was carried out on the Morice River near Houston, B.C. from the fall of 1978 to mid-1980. The objective of the program was to code wire tag at least 50,000 chinook fry from the 1978 and 1979 broods and as... -
A Risk Assessment Model for Skeena River Sockeye Salmon
This paper presents a risk assessment simulation model for Skeena River sockeye salmon harvested in marine and in-river fisheries in northern British Columbia. This paper also provides production and stock status background for Skeena River sockeye lakes.... -
A Review of the Limnology and Sockeye Salmon Ecology of Babine Lake
This literature review summarizes the academic understanding of Babine Lake ecosystems during the 1980s, also providing information on the log storage and handling aspects at the time. -
The Trapping and Marking of Sockeye Salmon Fry at Fulton River, Babine Lake B.C.
A comparative study of the distribution, growth, and survival of sockeye salmon fry resulting from the same parental stocks, but reared in natural and artificial conditions began in 1966 (McDonald 1969). Fry produced from natural spawning in the Fulton... -
Results of a Three Year Monitoring Program of Log Handling Activities on Babi...
This report presents the data collected during the downstream trapping and beach seining programs at Babine Lake during the years 1983, 1984 and 1985. -
1980 Morice River Coded Wire Tagging (CWT) Program
As a precursor to a proposed hatchery facility, bio-baseline and manageability studies were initiated in the spring of 1979 and continued in the spring of 1980. The purpose of the downstream portion of the 1980 study was four-fold: 1) to capture, rear and... -
Behaviour and Ecology of Sockeye Salmon Fry in the Babine River
A study of the behaviour of sockeye salmon fry during emergence and migration, along with an observation of the different stages of their lives. -
2018-2022 Implementation Plan - Wild Salmon Policy
The WSP lays out six strategies to restore and maintain healthy and diverse salmon populations and habitats, which can be grouped into three interrelated themes: Assessment, Maintaining and Rebuilding Stocks, and Accountability.