-
An Investigation of the Condition of Kathlyn Lake, with Suggestions for Rehab...
As early as 1970, and continuing into the year 1973, concerned citizens of the Smithers area brought to the attention of the Water Resources Services the fact that nuisance weed growths were occurring (and increasing) in Kathlyn Lake. In response to this... -
Water Management at Equity Silver Mines Ltd.
Predominantly all wastes, both tailing and blasted rock, contain pyrite and are classified acid generating. Acid generation occurs within waste rock fills around the property however not within tailing thus far due to sub- aqueous disposal of the product.... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an... -
Telkwa Coal Project Appendix 6: Baseline Data, Surface Water, and Groundwater...
Samples were collected for the first time from a watercourse on the proposed project site on the north side of the Telkwa, and from sites on the Telkwa River and Goathorn Creek which were previously sampled in 1988. Samples were also collected from the... -
Site Specific Risk Assessments of Two Former Copper Concentrate Shed Sites Ne...
In summary, the risk assessments identified COCs in soil that may have potential to cause adverse effects, especially to soil invertebrates and plants, although this is principally a theoretical risk owing to important habitat limitations in the most... -
Sampling of Metals and Aquatic Life in the Bulkley River Adjacent to the Form...
This study was carried out to monitor the effects, if any, of the former Topley Concentrate Shed Site ("Topley Site") on concentrations of dissolved and total metals and other parameters and on aquatic life in the Bulkley River. The study included three... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for Environmen...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The Application includes a description of the project, an outline of the Public and First... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Morrison Copper/Gold Project Assessment Report
This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health effects. It identifies measures to prevent or reduce adverse effects, and sets out... -
Morrison Copper/Gold Project 3rd Party Review Response Report
This report presents the response to the 3rd Party Review of the Environmental Assessment for the Morrison Copper/Gold Project. The 3rd Party Review was requested by the Environmental Assessment Office and was mainly directed towards the hydrogeology, water... -
Morrison Copper/Gold Application and Supporting Studies
This dataset contains elements of the Morrison Copper/Gold mine application which are relevant to salmon in the Skeena watershed. The document itself and its appendices constitute Pacific Booker Minerals' application for a certificate under the British... -
Drinking Water Source Quality Monitoring 2002-03: Lakelse Lake and Mountain C...
This document is part of a series presenting results of the B.C. Ministry of Environment (MoE, formerly Water, Land and Air Protection, WLAP) Skeena Region’s 2002-03 drinking water source quality monitoring program. It assesses drinking water sources in the... -
Davidson Project: Application for Environmental Assessment Certificate
This underground mining project will be located in the Bulkley-Nechako Regional District and in the traditional territory of the Wet'suwet'en people. Included in this dataset are the executive summary and elements of chapter six which deal directly with the... -
Comments from Skeena Fisheries Commission Re: Pacific Booker Minerals' Review...
This report from the Skeena Fisheries Commission addresses the shortfalls in the Pacific Booker Minerals' Review Response Report from a fisheries perspective. -
BC Water Portal
Water quantity (streams and wells) and water quality (surface and ground) monitoring stations maintained by the Environmental Monitoring System, Northern Health Authority, BC Oil and Gas Commission, Water Survey of Canada, BC Environmental Assessment... -
2012 Sustainability Report Closed Sites in Honduras, Mexico, the United State...
The focus of this report is on Goldcorp’s one closed site in Honduras (San Martin), one closed site in Mexico (Nukay in Guerrero), four closed sites in the United States (Dee and Daisy in Nevada, Rand in California, and Golden Reward in South Dakota) and... -
Davidson Project: Predicted Groundwater and Surface Water Chemistry Before, D...
This report illustrates and discusses the temporal trends in groundwater and surface water chemistry before, during, and after mining. It is based on empirical and predicted geochemistry and on the latest groundwater modelling using the MODFLOW model. -
Analysis of 2017 Water Quality Monitoring: Upper Bulkley River Watershed
This report analyzes the results of the 2017 water quality monitoring data from the Upper Bulkley River watershed to assess current water quality conditions, identify data gaps, and make recommendations to improve monitoring.