The Flooded Tailings Impoundment at the Equity Silver Mine
The Equity Silver Mine operated between 1980 and 1994, producing silver, gold, and copper from three open pits and a small underground operation. Mine components include a flooded tailings impoundment constructed from till and waste and quarried rock. This... -
Tenas Project: Project Description
Telkwa Coal Limited (TCL) is proposing to develop the Tenas Project (the Project), a surface coal mine designed to produce approximately 15.0 million tonnes of washed metallurgical coal product at about 0.750 million saleable tonnes per year to be used in... -
Telkwa Coal Project Appendix 6: Baseline Data, Surface Water, and Groundwater...
Samples were collected for the first time from a watercourse on the proposed project site on the north side of the Telkwa, and from sites on the Telkwa River and Goathorn Creek which were previously sampled in 1988. Samples were also collected from the... -
Skeena-Nass Area Water Quality Assessment and Objectives: Technical Appendix
This report assess present water quality of the mainstem Bulkley and Morice Rivers, to predict future water quality, and to recommend water uses that should be protected, and to recommend provisional water quality objectives to protect those uses. -
Site Specific Risk Assessments of Two Former Copper Concentrate Shed Sites Ne...
In summary, the risk assessments identified COCs in soil that may have potential to cause adverse effects, especially to soil invertebrates and plants, although this is principally a theoretical risk owing to important habitat limitations in the most... -
Nutrients and Algae in the Upper Bulkley River watershed 1997-2000
This study focused on the diffuse sources of nutrients and the trophic status of the Upper Bulkley River. Monthly water chemistry monitoring of the Upper Bulkley and tributaries was conducted between November 1997 and March 2000, and the end of growing... -
Morrison Copper/Gold Project Assessment Report
This Assessment Report considers the proposed Morrison Copper/Gold Mine Project’s potential to cause significant adverse environmental, economic, social, heritage, and health effects. It identifies measures to prevent or reduce adverse effects, and sets out... -
Morice Water Management Area - Multi-Year Operational Plan
This operational plan is the initial product of a partnership between the Office of the Wet’suwet’en and the Province of British Columbia to develop a water monitoring and assessment system for the recently established Morice Water Management Area (MWMA). -
Fish Monitoring Studies in Buck, Foxy and Crow Creeks and Goosly Lake
These reports present the results of the 2012 and 2017 fish monitoring programs conducted in the vicinity of Equity Mine near Houston BC. -
Equity Mine Water Quality Data
Equity mine water quality data from 2011 to 2016. Data includes pH, conductivity, anions and nutrients, metals, and total suspended solids. This is a subset of the BC Environmental Monitoring Stations (EMS). Visit... -
Davidson Project: Application for Environmental Assessment Certificate
This underground mining project will be located in the Bulkley-Nechako Regional District and in the traditional territory of the Wet'suwet'en people. Included in this dataset are the executive summary and elements of chapter six which deal directly with the... -
Comments from Skeena Fisheries Commission Re: Pacific Booker Minerals' Review...
This report from the Skeena Fisheries Commission addresses the shortfalls in the Pacific Booker Minerals' Review Response Report from a fisheries perspective. -
Environmental Impact Information of the Proposed Equity Mining Capital Ltd. D...
During 1974, Environment Canada undertook an additional study of the watershed adjacent to Equity Mining Capital Ltd.'s proposed development near Goosly Lake to supplement water quality baselines established in 1973. Chemistry analysis and 96 hour LC50... -
Effects of Equity Silver Mine on Goosly Lake
A report on the effects of the seepage and spill contaminates from Equity Silver Mine, near Houston, on lake water quality and biota in Goosly Lake. -
2021 BC Contaminated Mine Site Map
Map depicting over a hundred known and potentially contaminated mine waste sites that threaten to pollute waters, fish habitat and communities across British Columbia