Technical Data Reports for Enbridge Northern Gateway Project
Northern Gateway Pipelines Limited Partnership proposed to design, construct, and operate two pipelines extending from Bruderheim, Alberta, to Kitimat, British Columbia. Field surveys completed included sampling of fish species assemblages and habitat... -
Detailed Fish Habitat, Riparian and Channel Assessment for Select Central Bul...
Land use activities have had a significant impact on many of the tributaries within the central Bulkley River watershed. Preliminary air photo analysis has indicated that high value fish habitat has been moderately to severely impacted in a large proportion... -
Conserving Skeena Fish Populations and their Habitat
This report constitutes the Skeena Watershed Fish Sustainability Process Stage I document. Conserving Skeena Fish Populations and Their Habitat describes the planning process that includes prioritizing and selecting sub-basins to review. A biophysical... -
Telkwa Coal Project: Application for a Project Approval Certificate
The Application should be read in the context that it is the basis for the first major stage of the Environmental Assessment Process as it applies to new mine developments proposed for British Columbia. The purpose of the Application is to provide an... -
Skeena Fish Populations and their Habitat
This report is a follow-up to an earlier volume (Gottesfeld et al. 2002) which was prepared as part of the Skeena Watershed Fish Sustainability Plan process. The earlier report, Conserving Skeena Fish Populations and Their Habitat, presents an overview of... -
Review and Assessment of Water Quality in the Skeena River Watershed, British...
Historical water quality data presented for the Skeena River watershed are divided into nine subsequent sections, corresponding to the nine major watershed reaches. Each section is divided into 6 subsections: hydrology, land use history, water withdrawals,... -
Potential Effects of an Oil Pipeline Rupture on Reach 2 of Morice River: A Su...
This submission focuses on a portion of the pipeline route that is located adjacent to Morice River, 70 km south of Smithers. It examines the implications of a pipeline rupture and subsequent clean-up efforts to river processes, fish and fish habitat, and... -
Pacific Trail Pipelines Project: Volume 1 Report - Application for Environmen...
This Application for an Environmental Assessment Certificate for the KSL Project has been prepared pursuant to Section 16(1) of the B.C. Environmental Assessment Act. The Application includes a description of the project, an outline of the Public and First... -
Northwest Transmission Line: Bell-Irving Route Study
Sheffield studies and office-based reviews for this Bell-Irving Route Study Report were completed in August 2010. This report presents the results of baseline information collected as well as an evaluation of potential project effects on VECs along the... -
Natural Resource Stewardship Monitoring and Assessment Report for the Wet'suw...
Natural Resource Stewardship Monitoring and Assessment Reports are a summary of existing resource value monitoring and assessment information for a given geographic area. Data in this report has been arranged into the following categories: fish and water,... -
Morrison Copper/Gold Project 3rd Party Review Response Report
This report presents the response to the 3rd Party Review of the Environmental Assessment for the Morrison Copper/Gold Project. The 3rd Party Review was requested by the Environmental Assessment Office and was mainly directed towards the hydrogeology, water... -
Morrison Copper/Gold Application and Supporting Studies
This dataset contains elements of the Morrison Copper/Gold mine application which are relevant to salmon in the Skeena watershed. The document itself and its appendices constitute Pacific Booker Minerals' application for a certificate under the British... -
Kitimat - Summit Lake Pipeline Looping Project: Assessment Report
The purpose of this Assessment Report is to: describe the Project; summarize the process for the review of the Application; report on the adequacy of the Proponent’s distribution of information during the Application Review; report on whether the... -
Fish Passage Assessment of Highway 16 and CN Rail in the Bulkley Watershed
This Bulkley fish passage assessment is part of a larger regional effort to improve fish passage limited by highways and secondary roads throughout the Skeena Basin. The purpose of this report is to present background information and survey results for fish... -
Davidson Project: Application for Environmental Assessment Certificate
This underground mining project will be located in the Bulkley-Nechako Regional District and in the traditional territory of the Wet'suwet'en people. Included in this dataset are the executive summary and elements of chapter six which deal directly with the... -
Consequences of Unregulated Release of Raw Acid Mine Drainage into the Bulkle...
Approximately 800 000 m3 of acid mine drainage (AMD) is generated per year at the Equity Silver Mine southeast of Houston. This AMD would have devastating effects on the Bulkley River if it was allowed to flow untreated from the property for a prolonged... -
A Review of the Effects Assessment for the Morrison Copper/Gold Project
An assessment of the effects of the mine development on water flow, water quality and fish and aquatic resources has been carried out by the Proponent as part of its application for an Environmental Assessment Certificate. During the course of the Project... -
A Brief Overview of Fish, Fisheries and Aquatic Habitat Resources in the Mori...
The objective of this report is to present a concise distillation and elaboration where necessary, of the existing knowledge, studies and reports related to fish, fish habitat, other aquatic resources, riparian management, and generally factors related to...